background image

 

PPS71 Geothermal Memory Gauge with GRD 

User Manual 

Pioneer Petrotech Services Inc. 

[email protected] 

1-888-PP-GAUGE (774-2843) 

www.pioneerps.com 

 

 

Page 8 

(2)

 

Pressure and RTD temperature check 

 

Click “Start” Button (Fig.8) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(3)

 

CCL check 

 

Use a metal tube to test CCL function (Fig. 9, 10) 

 

 

 

Fig. 9                          

 

 

             

 

 
 
 
 
 
 
 

 

 

Fig. 8 

Fig. 10 

Summary of Contents for PPS71

Page 1: ...thermal Memory Gauge with GRD User Manual Rev 01 Pioneer Petrotech Services Inc 1 1431 40th Ave NE Calgary AB T2E 8N6 Canada Phone 1 888 PP GAUGE 774 2843 E mail infopps pioneerps com Website www pion...

Page 2: ...D User Manual Pioneer Petrotech Services Inc infopps pioneerps com 1 888 PP GAUGE 774 2843 www pioneerps com Page 1 REVISION HISTORY Revision Date Comments 00 2011 12 13 Initial release 01 2012 07 06...

Page 3: ...s 3 3 Introduction 4 3 1 Overview 4 3 2 Specifications 4 4 Getting Started 6 4 1 Inspecting the flask Heat Shield Inner Tube 6 4 2 Testing and Programming the Gauge 7 4 3 Activating and Testing Batter...

Page 4: ...Implementation The Field Service Manager and or Location Manager will ensure that this procedure is implemented 2 2 Supervision The Field supervisor Field Engineer Field Specialist in charge of each o...

Page 5: ...e and temperature or with a depth recorder PPS36 DepthWatcher to incorporate depth with downhole data 3 2 Specifications Pressure Measurement Sensor type Silicon Sapphire Pressure range Up to 18 000 p...

Page 6: ...hours at 300 C 8 hours at 250 C 10 hours at 200 C 12 hours at 180 C Power supply Operation voltage 5 5 7 2VDC Battery Two C size 180 C Li battery 5Ahr 7 2V Power consumption Operation current shutdow...

Page 7: ...oint 100 C Fill in the flask with the boiled water to the proper position Fig 2 Sink the RTD probe into the flask and seal it with the heat isolator Fig 3 Fig 3 Fig 4 Step 2 Record temperature reading...

Page 8: ...amming the Gauge PPS SmartView software can be used to test and program the gauge before a field operation For more information about the software please refer to SmartView Software Manual 1 Test the...

Page 9: ...nual Pioneer Petrotech Services Inc infopps pioneerps com 1 888 PP GAUGE 774 2843 www pioneerps com Page 8 2 Pressure and RTD temperature check Click Start Button Fig 8 3 CCL check Use a metal tube to...

Page 10: ...erps com 1 888 PP GAUGE 774 2843 www pioneerps com Page 9 4 Spinner check Blow the spinner to see if the Flow Rate is greater than zero Fig 11 12 Fig 11 Fig 12 5 Gamma Ray check Measure Gamma ray in t...

Page 11: ...w pioneerps com Page 10 6 Program the Gauge Program the gauge in Program Tab Fig 17 Fig 17 For more information about programming please refer to SmartView Software Manual We recommend using 1s sampli...

Page 12: ...tery Fig 18 Plug in the battery the battery s LED will turn on Press the black button to apply load to the battery Fig 18 2 Testing battery with the gauge Plug in the battery the battery s LED should...

Page 13: ...s com Page 12 4 4 Assembling Flask Housing Parts Item Part Name Description QTY 1 Battery PPS 180 C or 200 C C size battery pack 1 2 C Ring PARKER Seal ECE 001385 07 14 6 SPC 1 3 O Ring KALRAZ 2 123 2...

Page 14: ...Inc infopps pioneerps com 1 888 PP GAUGE 774 2843 www pioneerps com Page 13 Fig 22 Fig 23 Fig 24 Step 3 Install a metal C Ring Fig 22 Step 4 Install two O Rings Fig 23 Apply o ring grease on the O Rin...

Page 15: ...Inc infopps pioneerps com 1 888 PP GAUGE 774 2843 www pioneerps com Page 14 Fig 25 Fig 26 Fig 27 Step 6 Place the Spring Fig 25 Step 7 Install the Flask Housing Fig 26 Step 8 Install the Flask Housing...

Page 16: ...r gauge is ready for an operation Step 1 Remove one of the plugs Fig 28 using an Alan key size 5 32 Step 2 Purge the spinner with hydraulic oil using a handpump oiler Fig 29 Step 3 Re install the oil...

Page 17: ...tenance Manufacturer s maintenance 5 1 Field Maintenance IF the gauge is functional IF the flask still keeps a good performance for heat shielding IF the battery is new or has enough power for an oper...

Page 18: ...sing the impeller puller tool to remove the impeller to prevent excessive loads from being applied to the bearings Screw left hand thread puller onto the impeller and while holding the puller body rot...

Page 19: ...e 2 set screws 9 after orienting the set screws with the flats on the shaft but make sure the top of the impeller 8 is flat to the top of the shaft 5 Apply Loctite on the set screws 9 Insert the space...

Page 20: ...enance is implemented at PPS manufacturing facility or the authorized representative locations The following maintenance services are performed Full function check and test Failed components and parts...

Page 21: ...or damaged Upgrade to latest software version or reinstall ensure USB devices disconnected Interface box is defective Use another interface box Gauge is defective Try connecting to another gauge to c...

Page 22: ...ing grease 450 C 100g 1 18 01 AC 1051 A Anti seize compound 800 C 225ml 1 19 01 AC 1156 A Gamma Ray tester PPS Part 1 20 01 AC 1316 A Battery tester PPS Battery Tester 0 10V 1 21 01 AC 1317 A USB cabl...

Reviews: