background image

14

OBS.: 

On the first activation, the barrier will move slowly in the opening 

and closing directions as it reads the path. Soon after the reading, the 

operation is normalized and will start operating at the factory default 

speed.  For  more  accurate  adjustments,  refer  to  the  electronic  board 

options.

OPERATION

The barrier is operated by a micro-controlled control board, activated via 

remote control or any other device that provides a NO (Normally Open) 

contact.

 

TRIFLEX CONNECT AC CONTROL BOARD

The control board operates with a frequency inverter, which drives the 

three-phase induction motor from a single-phase AC power supply and a 

logic controller to carry out the inverter operations. For more information, 

refer to the TRIFLEX CONNECT AC control unit manual.

ENCODER SYSTEM (DIGITAL REED)

An  encoder  monitors  the  barrier  position.  Also  called  Digital  Signal 

Angular Positioning Transducer System, it is used to precisely control and 

monitor the gearmotor movements.

Therefore, there is the possibility of recording certain gate positions in 

the  memory  and  enabling  the  control  board  to  control  opening  and 

closing. This is done by employing sensors that inform the barrier travel 

direction and position during operation.

Thus, it is a device responsible for the barrier path's reading, memorization, 

and accuracy.

Summary of Contents for JETFLEX BRASSO

Page 1: ...Technical Manual P31491 09 2022 Rev 0 All images in this manual are for illustrative purposes only Manufactured by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado...

Page 2: ...installed Notice the need for optional accessories Calculate the flow of vehicles on site NOTE If the floor does not meet the above specifications a concrete base plate respecting the cabinet base di...

Page 3: ...et with anti corrosion treatment and electrostatic painting guarantee excellent resistance against the action of time Limit switch system with encoder Electronic brake Allows installing several access...

Page 4: ...ion door must face the side of the road or vehicle passage INSPECTION DOOR FRONT Curb useful height Sobra 300 mm Useful length Barrier length 280 mm Fixing Deduct from the barrier length 280 mm Barrie...

Page 5: ...previously marked locations OBS Make 04 holes with a 10mm drill and at least 80 mm deep 4 Insert the anchor bolts in the holes of the base as shown below OBS The anchor bolts must not be inserted thor...

Page 6: ...ables Use a dedicated circuit breaker that is a circuit breaker where only the barrier will be connected 11 Check setthebarrieralignment openingandclosing Usemechanical stops for this situation and mo...

Page 7: ...nsioned and ready for operation With your thumb apply even pressure on the belt If it does not bend it is because it is well tensioned If the belt is loose adjust it through the belt tensioner screws...

Page 8: ...drives the three phase induction motor from a single phase AC power supply and a logic controller to carry out the inverter operations For more information refer to the TRIFLEX CONNECT AC control uni...