BUILDING THE BASE PLATE TO INSTALL THE
CABINET
Build a concrete base so that the highlighted direction (350) faces the curb
(street, passing vehicles) according to the suggested dimensions.
OBS.:
Measurements in mm. The base plate must be leveled to allow the
equipment to perform better.
INSTALLING THE BARRIER
1. When fixing the barrier, notice that the cabinet inspection door must
face the side of the road or vehicle passage.
INSPECTION
DOOR
FR
ONT
Curb useful height
(Sobra) 300 mm
(Useful length = Barrier length -280 mm)
(Fixing – Deduct from the barrier length) 280 mm
(Barrier length)
Ground clearance at barrier base
150 mm (Opening deduction)
Open barrier height
0.04 m Safety margin
Cover
Cover
¾”
CONDUIT PIPE
(MINIMUM) FOR THE CABLES
POSITIONED IN THE CENTER
OF THE BASE
Barrier base
Barrier base
Distance from barrier base to cover
Distance from barrier base to cover
Ground clearance
Ground clearance
INSPECTION DOOR
VEHICLE FL
OW
DIRECTION