PPA DZ HOME Technical Manual Download Page 5

4

DZ HOME

OPERATOR TYPE

SLIDING

SLIDING

SLIDING

RATED VOLTAGE

220 V

220 V

127 V

NOMINAL FREQUENCY

60 Hz

50 Hz

60 Hz

RATED POWER

460 W

470 W

335 W

MOTOR ROTATION

1740 rpm

1455 rpm

1740 rpm

NOMINAL CHAIN

2,15 A

2,37 A

2,86 A

REDUCTION

1:24

1:24

1:24

LINEAR SPEED

16,4 m/min

13,7 m/min

16,4 m/min

PERFORMANCE

30 cycles/h

30 cycles/h

30 cycles/h

DEGREE PROTECTION

IPX 4

IPX 4

IPX 4

TEMPERATURE RANGE

-5° C / +50° C

-5° C / +50° C

-5° C / +50° C

ISOLATION TYPE

Class B, 130 ° C

Class B, 130 ° C

Class B, 130 ° C

LIMIT SWITCH

ANALOG

ANALOG

ANALOG

DZ HOME JET FLEX / DZ HOME BLDC

OPERATOR TYPE

BLDC SLIDING

JET FLEX SLIDING

RATED VOLTAGE

220 V / 127 V

220 V / 127 V

 NOMINAL FREQUENCY

60 Hz

60 Hz

RATED POWER

100W / 130W

100W / 130W

MOTOR ROTATION

4500 rpm

4365 RPM

NOMINAL CHAIN

0,7A / 1,4A

2,75 A / 3,6 A

REDUCTION

1:22

1:22

LINEAR SPEED

36 m/min

41 m/min

PERFORMANCE

100 cycles/h

40 cycles/h

DEGREE PROTECTION

IPX 4

IPX 4

TEMPERATURE RANGE

-5° C / +50° C

-5° C / +50° C

ISOLATION TYPE

Class B, 130 ° C

Class B, 130 ° C

LIMIT SWITCH

Hybrid

Hybrid

MAX. MASS FROM THE 

GATE LEAF 

400kg

400kg

MAXIMUM DIMENSION; 

GATE

HEIGHT = 2,5 m LENGTH 

= 3,0 m

HEIGHT = 2,5 m LENGTH 

= 3,0 m

TECHNICAL CHARACTERISTICS

Summary of Contents for DZ HOME

Page 1: ...MOTOPPAR IND STRIA E COM RCIO DE AUTOMATIZADORES LTDA Av Dr Labieno da Costa Machado 3526 Distrito Industrial CEP 17400 000 Gar a SP Brasil Fone Fax 14 3407 1100 www ppa com br...

Page 2: ...Warning Do not use the product without first reading the instruction TECHNICAL MANUAL DZ HOME...

Page 3: ...ristics 4 Tools required for installation 5 Electrical installation 5 Care with the electrical installation 6 Care with the gate before operator 7 Installing and fixing the operator 8 Equipment dimens...

Page 4: ...LOG OPERATOR read and strictly follow all the instructions contained in this manual Before installing the operator system make sure that the local electrical network is compatible with the one require...

Page 5: ...30 C Class B 130 C LIMIT SWITCH ANALOG ANALOG ANALOG DZ HOME JET FLEX DZ HOME BLDC OPERATOR TYPE BLDC SLIDING JET FLEX SLIDING RATED VOLTAGE 220 V 127 V 220 V 127 V NOMINAL FREQUENCY 60 Hz 60 Hz RATED...

Page 6: ...en the total shut off device and the operator connection point 1 2 diameter conduits for buttonhole external and optional 1 2 diameter for safety photocells optional PLIERS SAWING BOW SOCKET WRENCH SC...

Page 7: ...ched to the operator Wiring must be done through conduits passing internally through the base of the floor ensuring that none of the wiring conductors are trapped and damaged IMPORTANT The device must...

Page 8: ...e previous operation The gate shall have a sturdy and as far as possible non deformable structure The pulleys shall be of diameter conforming to the dimensions of the gate are in perfect running condi...

Page 9: ...level unobstructed periodically from any element or dirt that makes it difficult to slide the pulleys all the way as shown in the figure below INSTALLATION AND FIXING THE OPERATOR Before installing t...

Page 10: ...the equipment can be screwed so that it is level If it does not comply with the requirement provide a concrete base following the guidelines below 2 Step Base dimensions should be appropriate for the...

Page 11: ...te leaf obeying the 50 mm measurement between the leaf end and the operator 4 Step Pre align the operator to the gate positioning the rack over the gear and pushing the assembly against the gate Then...

Page 12: ...or in the course of its course If this occurs back off the operator 6 Step With the operator unlocked position the rack bar on the gear and aligned with the gate It is necessary to leave a gap of appr...

Page 13: ...th solder or screw every 300 or 400 mm 8 Step If the door leaf is warped provide shims to ensure the alignment of the rack There are cases where the rack should pass the length of the leaf In this cas...

Page 14: ...ly tightening the screws ANALOG LIMIT SWITCH INSTALLATION 1 Step With the gate closed place the magnet holder in the rack positioned in front with the REED of the operator This magnet will act as a cl...

Page 15: ...Fully open the gate and place the other magnet holder on the rack facing the REED operator This will act as a magnet to opening limit switch MAGNET SUPORT REED SUPORT UPPER VIEW RACK MAGNET SUPORT OPE...

Page 16: ...ting off properly If necessary invert the connector on the board After attaching the magnet holders make final adjustments by moving to the right or left depending on the desired setting 4 Step To fin...

Page 17: ...t switch A Make sure the mains power is turned on correctly B Replace fuse with the same specification C Make sure that there are no objects blocking the operation D Replace the limit switch system an...

Page 18: ...17...

Reviews: