
10
3º Step:
Once the conditions have been fulfilled, open the gate completely and
position the operator system near the face of the gate leaf, obeying the 50 mm
measurement between the leaf end and the operator.
4º Step:
Pre-align the operator to the gate, positioning the rack over the gear and
pushing the assembly against the gate. Then mark the fixing holes in the floor or
concrete base.
GATE LEAF
MARK THE HOLES OF
FIXING THE FLOOR
MARK THE HOLES
OF FIXING THE FLOOR