6
7
EQUIPMENT DIMENSIONS
CONSTRUCTION OF THE BASE FOR ANCHORING
THE CUBICLE
Build a concrete plinth, so that the highlighted orientation (Ex: “400” -
'Barrier' Automatic Barrier) is located towards the curb (street, traffic lane),
following the suggested dimensions.
Note:
Measurements in millimeters. It is very important that the concrete
plinth is level; this provides the product with a better performance/operation.
FR
ONT
INSPEC
TION DOOR
MINIMUM) 3/4" CONDUIT)
FOR WIRING, PLACED IN THE
CENTER OF THE CONCRETE
PLINTH
Ceiling
Ceiling
Base of the barrier
Base of the barrier
)Free span)
)Free span)
)Extra space)
300mm
Useful Length = Beam length - 280mm
)In order to mount it, take this measurement out) 280mm
)Beam length)
Clear
anc
e
)Clear
anc
e)
0.04m
)40mm) S
af
et
y M
ar
gin
Heigh
t of '
Open
' B
eam
150mm
)M
easur
emen
t t
o be taken out
)of the opening measur
emen
t
)F
ree span a
t the base of the bar
rier
)
)U
seful Heigh
t on C
ur
b)