PowerWave MRac L Feet Installation Manual Download Page 14

E N E R G Y

INSTALLATION MANUAL

Powerwave Energy (hereinafter as “Powerwave Energy”) warrants to 
the original purchaser (“Purchaser”) of product(s) that it manufactures 
(“Product”) at the original installation site that the Product shall be 
free from defects in material and workmanship for a period of ten (10) 
years, except for the anodized finish which shall be free from visible 
peeling, or cracking or chalking under normal atmospheric conditions.

Warranties and guarantees can only be claimed if the installation and 
commissioning of the photovoltaic system was done by professional 
personnel, as can be proved. We guarantee a 10 year warranty for the 
durability of all our MRac PV mounting products that are correctly 
mounted, installed and used as our Installation Guide says.

Powerwave Energy shall not be liable for consequential, contingent or 
incidental damages arising out of the use of the Product by Purchaser 
under any circumstances. If within the specified Warranty periods the 
Product shall be reasonably proven to be defective, then Powerwave 
Energy shall repair or replace the defective Product, or any part 
thereof, in Powerwave Energy’s sole discretion. 

Such repair or replacement shall completely satisfy and discharge all 
of Powerwave Energy’s liability with respect to this Limited Warranty. 
Under no circumstances shall Powerwave Energy be liable for special, 
indirect or consequential damages arising out of or related to use by 
Purchaser of the Product. Manufacturers of related items, such as PV 
modules and flashings, may provide written warranties of their own. 
Powerwave Energy’s Limited Warranty covers only its Product, and not 
any related items.

The warranty period begins from the delivery or pick up date from 
Powerwave Energy factory or warehouse. The replacement or repair  
of defective components does not extend the warranty period.

10 Year Limited Product Warranty, 

5 Year After Sales Service

Warranty

  |  

13

Summary of Contents for MRac L Feet

Page 1: ...MRAC STEEL ROOF INSTALLATION GUIDE L FEET HOOK E N E R G Y...

Page 2: ...E N E R G Y INSTALLATION MANUAL Product Introduction 01 Product Introduction 02 Installation Tools 03 Components 03 Solution Overview 04 Installation Guide 05 Warranty 12 Contents...

Page 3: ...lation guide through contacting Powerwave Energy by email Complying with all applicable local or national building codes including any that may supersede this manual Ensuring that MRac and other produ...

Page 4: ...Tools Components 03 6mm Inner hexagon spanner 0 8mm adjustable wrench electrical tools 5m tape measure Infrared calibrator 2 Installation Tools 3 Components MA End Clamp Kit L Feet Waterproof Plate M...

Page 5: ...E N E R G Y INSTALLATION MANUAL Solution Overview 04 1 MA Rail 2 MA End Clamp Kit 3 L Feet 4 Splice for MA Rail 5 MA Inter Clamp Kit 6 Waterproof Plate 4 Solution Overview 4 1 Components 1 2 5 3 4 6...

Page 6: ...not pass through the bottom of the MA Clamp 5 Installation Guide 5 1 Installation of Clamp Kit At this point the bolt can still slide freely in the rail slide the bolt to the position where the Inter...

Page 7: ...Installation of L Feet 5 2 1 According to the plan size of the drawing install the L Feet on the metal roof and pre lock it as shown in the figure 5 3 1 According to the plan if the rail is not long...

Page 8: ...d the anodized film of the corrugated surface of rail splice can be pierced so that the two bolts are conducted through the corrugated sheet Installation Guide 09 5 Installation Guide 5 3 Installation...

Page 9: ...il connectors are on the same side as shown on the right Recommended torque 8 N m The rail connectors are on the same side 5 3 4 Install the planned location according to the engineering plan and inst...

Page 10: ...the solar panel assembly and then tightly lock the bolt recommended torque 8N m 5 4 2 Put the pre installed Inter Clamp Kit from the top and bottom into the rails and firmly attach the solar panel ass...

Page 11: ...viously installed solar panel assembly and lock the inter clamp assembly recommended torque 8 N m Installation Guide 10 5 Installation Guide 5 4 Install the panels Please note that the anti skid prote...

Page 12: ...t the inter clamp with grounding clip on the rail and the four corners of the grounding clip will stick closely to rail pic 2 The next step is to put the panels on the top of grounding clip strap pic...

Page 13: ...and the larger part of the slot is used for to hold 2 pieces of DC cables Installation Guide 12 5 Installation Guide 5 3 Installation of Solar Panels Pic 2 Pic 1 Pic 3 Then install two sets of groundi...

Page 14: ...ising out of the use of the Product by Purchaser under any circumstances If within the specified Warranty periods the Product shall be reasonably proven to be defective then Powerwave Energy shall rep...

Reviews: