
E N E R G Y
INSTALLATION MANUAL
Installation Guide
|
11
5. Installation Guide
5.4 Installation of Solar Panels
If there is grounding clip in the
design, please install the grounding
clip with inter clamp (pic. 1). Then
put the inter clamp with grounding
clip on the rail and the four corners
of the grounding clip will stick
closely to rail (pic. 2).
The next step is to put the panels on the top of grounding clip
strap (pic. 3). The installation of other grounding clips follows
the same practice.
Pic 3
Pic 2
Pic 1
5.4.4 Place the last solar
panel assembly in each
row on the rail and lock
it with the End Clamp Kit
(recommended
torque: 8N·m).