background image

Storage & Maintenance

The  unit  contains no user-serviceable parts. If the battery service life
(3~5  years  at  25°C  ambient  temperature)  has  been  exceeded,  the

batteries must be replaced. In this case, please contact your dealer.

Storage 

Before  storing,  charge  the  unit  4  hours.  Store  the  unit  covered  and 
upright in a cool, dry location. During storage, recharge the battery in 
accordance with the following table: 
Storage Temperature 

Recharge Frequency 

Charging Duration 

-25°C - 40°C

Every 3 months 

1-2 hours

40°C - 45°C 

Every 2 months 

1-2 hours

Be sure to deliver the spent battery to a recycling facility or ship 

it to your dealer in the replacement battery packing material. 

Installation and Setup

NOTE: 

Before installation, please inspect the unit. Be sure that nothing inside

 

the package is damaged. Please keep the original package in a safe place for

 

future use

CAUTION – A battery can present a risk of electrical shock and high short

 

circuit current.   The following precaution should be observed when

 

working on batteries:

1.

Remove watches, rings, or other metal objects.

2.

Use tools with insulated handles.

3.

Wear rubber gloves and boots.

4.

Do not lay tools or metal parts on top of batteries.

5.

Disconnect charging source prior to connecting or disconnecting

 

battery terminals.

Do not plug or unplug the battery connector if UPS works in DC

(discharging) mode. 

Summary of Contents for BP A48R-8x9Ah

Page 1: ...User Manual Battery Pack ...

Page 2: ...ironment The warranty for this battery bank will be void if water or other liquid is spilled or poured directly onto the battery box Similarly we do not warrant any damage to the battery box if foreign objects are deliberately or accidentally inserted into the battery box enclosure The battery will discharge naturally if the system is unused for a period of time It should be recharged every 2 3 mo...

Page 3: ... a recycling facility or ship it to your dealer in the replacement battery packing material Installation and Setup NOTE Before installation please inspect the unit Be sure that nothing inside the package is damaged Please keep the original package in a safe place for future use CAUTION A battery can present a risk of electrical shock and high short circuit current The following precaution should b...

Page 4: ...n left take out the plastic isolation tray for later assembly 44 040053 XXG 3 As shown left get 4 batteries in serial connection 26 000003 XXG 45W 12V 9AH Please be noticed about the rubber protection on the red wire 1 As shown above unscrew all screws on the battery isolation pad for separation Screw P N 38 000008 00G 6 Torque 8KG 6 SOP How to assemble BP A48R 8x9Ah ...

Page 5: ... previous isolation tray 2 As shown left Put on the warning stick 37 000031 XXG onto the battery text facing up Warning Stick Tool Pliers Notice 1 Check with correct battery spec 2 No short between positive and negative polar of batteries 3 No reverse connection is allowed ...

Page 6: ...t take out the plastic isolation tray for later assembly 44 040053 XXG 2 As shown left get 4 batteries in serial connection 26 000003 XXG 45W 12V 9AH Please be noticed about the rubber protection on the red wire 4 As shown left Put on the warning stick 37 000031 XXG onto the battery text facing up Warning Stick ...

Page 7: ...orrect and missed isolation stick is allowed 2 No missed screwing is allowed 5 1 As shown both of two Push the assembled battery bank into the case following the instructed direction the red arrow 2 As shown bellow screw the processed battery isolation pad onto the case M3 6 round cross screw 38 000008 XXG 6 Torque 8KGF CM 3 Check with no missed isolation sticks on the 4 battery terminals 44 04004...

Reviews: