
Verifying configuration
Wait for 2 minutes after connecting everything, and then via the web page, click on the
“MultiStat” button.
Verify that all the batteries are responding.
If you are unable to see the status of all the batteries, press the “Configuration” button
and then press the “Restart Polling” button in the configuration page.
Request login details for the portal
The portal URL is: https://performance.powerplus-energy.com.au:3000/login
To gain your login information for the portal, email “[email protected]"
and provide the following information:
• Subject line: Portal access request
• PowerLink Serial Number
• Site Name
Our support team will then create a login and email it to you the details once complete.
PowerLink Installation
and Operation Manual
V 3.2
Page of
8
8
+61 3 8797 5557
Building 21-25, 885 Mountain Hwy
Bayswater Vic 3153
PO Box 4407, Knox City Vic 3152
[email protected]