8850265
Welding Cart with 2 Slide Drawers
V1.0
6
For technical questions call 1-800-665-8685
DRAWER
12. Align an M8 nut (#18) on the left-side predrilled hole of the drawer’s (#20)
outside. Place the drawer handle (#17) through the M8 nut (#18) and use
the M8 flange nut (#19) to secure the handle from inside the drawer.
13. Repeat step 1 to secure the right side of the drawer handle.
14. Repeat step 1 and step 2 to install the second shelf drawer handle.
15. Insert the top drawer into the welding cart body, then the lower
drawer, in that order.
UPPER COVER PLATE
16. Place the upper cover plate (#8) on top of the welding cart body. Align
the pre-drilled holes with the holes on the cart body’s top surface.
17. Install an M6X13 bolt (#5) with one flat washer (#7) and one spring
washer (#6) through a pre-drilled hole.
18. Repeat step 2 to install the other bolts and make sure the upper cover
plate (#8) is secure against the cart body.
HANDLE
19. Place the handle (#2) on the welding cart body. Align the pre-drilled
holes with the holes on the cart body’s rear.
20. Install an M6X35 bolt (#4) with one flat washer (#7) and one spring
washer (#6) through a pre-drilled hole.
21. Repeat step 2 to install the other bolts to secure the handle (#2) to the
cart body.
HOOK
22. Line up the hook (#1) on the left side of the handle.
23. Align the hook with the pre-drilled holes on the handle. Insert an
M6X35 bolts (#4) through one flat washer (#7) and one spring washer.
Insert the assembled bolt (#6) through a pre-drilled hole and secure
with an M6 nut (#3). Repeat with a second bolt.
24. Repeat step 2 to install the hook on the right side of the handle.
25. Use M6X13 bolts (#5) with a flat washer (#7) and a spring washer (#6)
to install the remaining three hooks: one on the rear below the handle
(#2) and on both sides of the upper cover plate (#8).