18
2. Replace UPS’s front pannel and EBM’s front pannel.
Figure 19. Replace UPS’s front pannel and EBM’s front pannel.
10K Model:
Figure 20. Plug the EBM cable into the UPS battery conector
CAUTION:
Please connect the EBM to protective ground with 8 AWG wire for
EBM model firstly.