background image

PECO-OP | UK | 01.13

www.powertowers.com

100% British designed and manufactured.

Summary of Contents for pecolift

Page 1: ...Operating and Maintenance Manual by...

Page 2: ...faces and as it has no batteries electric motor electrics or hydraulics it is very ecologically friendly It is ideally suited to working in a very wide range of applications from the very clean enviro...

Page 3: ...1 person tools Maximum manual force 200 N Maximum gradient for operation 0 degrees Maximum wind force Internal use only 0 zero mph Maximum wheel force 125 kg Maximum castor point load 125 kg 123kN Sou...

Page 4: ...h fixed or moving objects 10 Ensure that the safe working load is evenly distributed on the platform 11 Ensure the machine is being operated within the PUWER Provision and Use of Workplace Equipment R...

Page 5: ...PRIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS 5 Flywheel Spirit Level Swivel Castor Auto Lok Braked Wheel Emergency Lowering Tool Tool Tray Rubber Foot Pad Gates Platform Tray Flywheel Handle...

Page 6: ...h a safety harness point If the operator chooses to wear a safety harness an approved fall restraint type harness should be worn with a very short lanyard Operating procedures are divided into three k...

Page 7: ...ack to lock wheel Repeat but turn handle once clockwise with knob held pulled towards you Wheel should turn freely Turn once anti clockwise to come down pic 6 9 Check emergency lowering tool is attach...

Page 8: ...ket 1 Locate emergency lowering tool on chassis pic 2 remove from fixing 2 Stand to side of machine attach hook end of emergency lowering tool to fly wheel handle knob in basket releasing handle knob...

Page 9: ...castor mounting allows machine to sink onto its rubber pads feet when stepping on front of platform Check machine springs back up again when weight is removed from platform and machine is pushed forwa...

Page 10: ...sed pliers and pulling outward and then releasing Ensure plunger springs back freely Refit cover and screw Paint seal screw when refitted 5 Inspect condition of automatic wheel lock Look under brush s...

Page 11: ...lowing precautions should be taken ensure the machine is fully lowered and ideally place a cover over the machine Upon removal from storage and prior to returning to use ensure machine pre operation c...

Page 12: ...M 403 F Mudguard PEL M 404 G Tool Box PEL M 405 H Peco lift Decal Set 1 PEL M 600 I Peco lift Decal Set 2 PEL M 601 J Peco lift Decal Set 3 PEL M 602 K Chassis Cover PEL M 406 L Emergency Lowering To...

Page 13: ...gents for repair or assessment against a warranty claim on any Pecolift or component Materials and or labour costs to renew repair or replace components due to fair wear and tear Faults arising from t...

Page 14: ...TEST RESULTS NOTES Description Work Carried out Date ALTERATIONS REPAIRS Description Work Carried out Date...

Page 15: ...PECO OP UK 01 13 www powertowers com 100 British designed and manufactured...

Reviews: