background image

                                              Page 7 of 7 

User Manual  Solar Pumping SD500 

Document APR0006

 

 
4.- 

CONNECTION SCHEME 

 
Only the start/stop signal must be connected to the PLC DI1, it´s not necessary 
to connect any signals at the inputs/outputs of the inverter.  
 
 
Terminals 24G and P0 (DI1): Start / Stop. 
 
 

 

Reviews: