When moving the platform UP or DOWN check the rollers on the towers to verify that
the pressure on the rollers is not too much. (Rollers should only be slightly
compressed). If needed the stirrups need to be repositioned. Move the stirrups closer
to the front in order to reduce the pressure on the tower rollers. Move the rollers to the
rear to increase the pressure on the tower rollers.
When going up on the blade to the highest point, the top plate (which has been fixed
to the steel wire during installation) will activate the Top limit switch and the UP and
DOWN direction will be cut. To reset the, lower the hoist a bit by pulling on the yellow
brake lever on the Titan hoist. Once the top plate is not in contact with the activating
bar of the Top limit switch, the system is reset.
The loading on the platform should be uniformly distributed therefore DO NOT
go with all 3 operators to the extreme ends at the same time.
Only trained operators should be allowed on this platform.
REMARK: When using a Generator to power the platform the capacity
of the Generator should be Min 15 KVA with 16A 5 pins socket with an
output of NEarth