background image

8.

 

View Data  

wait  for  the  unit  to  transmit.  Once  complete,  data  can  be  viewed  on 
MetronView. The unit will countdown for 45 seconds, then enter Run Mode. 
Screen will turn o

ff.

 

For live channel readings, channels can be selected from the menu by pressing 
right on Channels and Read Now.  

 

7.

 

Programming  

Visit: 

www.metronview.com

 

Login  cr

edenti

als  will  have 

been sent by email. 

Once logged in, a summary of 
the units will be visible. Click 
view to the le

ft

 of the device’s 

name  to  see  the  historical 
data. 

Powtechnology  support  can 
change the name of units and 
inputs if required. 

Units can be remotely programmed from MetronView. It is 
possible  to  change  how  o

ft

en  units  are  taken  &  sent,  alter 

scaling and alarm thresholds for each input channel and much 
more. 

To make changes contact Powtechnology support.

 

The con

gura

ti

on will be held on the server and downloaded 

to the device when it next communicates. 

Select ‘Force transmit’ rather than wai

ti

ng for the next 

ti

me 

the device transmits in order to recon

gure sooner. 

Failure to mount the solar panel exactly in accordance with the aforemen

ti

oned rules may result in the unit failing during mid-

Winter.  If the power drain is greater than expected (from poor signal or lots of retries), a 2

nd

 solar panel may be required.  

Common Latitudes: 

-

 

London: 51.5

o

; Card

iff

: 51.5

 o

; Birmingham: 52.5

o

; Leeds: 54.0

 o

; Belfast: 54.5

 o

Edinburgh: 56.0

 o

; Aberdeen: 57.0

 o

 

-

 

Example calcula

ti

on: 

London = 51.5

+ 10 = 

61.5

o

 

tilt an

gle from the horizontal 

 

Note 

[email protected]

Tel: +44(0) 1827 310 666

EASY INSTALL GUIDE: M4/SOL-SYS

 

[email protected]

Tel: +44(0) 1827 310 666

Reviews: