background image

Dokument

 

D

GB-0600 Dokum D Anbaugeräte

-  -

ALOIS PÖTTINGER Maschinenfabrik GmbH
A-4710 Grieskirchen
Tel. (07248) 600 -0
Telefax (07248) 600-511
GEBR. PÖTTINGER GMBH
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-111 / 112
Telefax (0 81 91) 92 99-188

GEBR. PÖTTINGER GMBH
Servicezentrum
D-86899 Landsberg/Lech, Spöttinger-Straße 24
Telefon (0 81 91) 92 99-10 / 21
Telefax (0 81 91) 59 656

 

Machine checked according to delivery note. All attached parts removed. All safety equipment, drive shaft and operating 

devices at hand. 

 

Operation and maintenance of machine and/or implement according to operating instructions explained to the customer. 

 

Tyres checked re. correct pressure. 

 

Wheel nuts checked re. tightness. 

 

Drive shaft cut to correct lenght.

 

Correct power-take-off speed indicated. 

 

Fitting to tractor carried out: to three-point linkage

 

Trial run carried out and no defects found. 

 

Functions explained during trial run. 

 

Pivoting in transporting and operating position explained. 

 

Information given re. optional extras. 

 

Absolute need to read the operating manual indicated. 

Please check.      X

According to the product liability please check the above mentioned items. 

INSTRUCTIONS FOR 
PRODUCT DELIVERY

GB

In order to prove that the machine and the operating manual have been properly delivered, a confirmation is necessary.
For this purpose please do the following:
-  sign the 

document A and send it to the company Pöttinger

  (in case of Landsberg equipment: to the company Landsberg)

document B stays with the specialist factory delivering the machine.

document C stays with the customer.

Summary of Contents for HIT 470 N

Page 1: ...h Nr Fgst Ident Nr 3425 4 3 2 02 5 4 6 29 0AGE 4RANSLATION OF THE ORIGINAL PERATING ANUAL Ihre Your Votre Masch Nr Fgst Ident Nr R Tedder 99 2041 GB 80I 0 HIT 470 N Type ZK 2041 01001 HIT 470 H Type Z...

Page 2: ...damage is damage caused by a machine and not to it An excess of Euro 500 is provided for such a liabilioty In accordance with the laws of product liability entrepreneurial property damages are exclude...

Page 3: ...s checked re tightness Drive shaft cut to correct lenght Correct power take off speed indicated Fitting to tractor carried out to three point linkage Trial run carried out and no defects found Functio...

Page 4: ...lectrical cables 5 Lowering the rotary tedder 6 Parking in the open 6 Winter storage 6 Lowering the machine Danger of tipping 7 ADJUSTMENTS BEFORE OPERATION Adjustment of rotor inclination 8 Tine adju...

Page 5: ...A1 points 7 8a 8h Pinning the machine to the three point linkage Fix the hydraulic lower link 4 in such a way that the machine cannot swing out sideways Push in the support foot 5 and secure Drive sh...

Page 6: ...agedwhengaraging the implement Lowering the rotary tedder Always park implement stabily secure against rolling and tipping over The implement can be parked while in the transport or working position S...

Page 7: ...danger of tipping Then uncouple the implement from the tractor Note When in operation the support stand must be placed in the upper position and secured with pin V Lowering the machine Danger of tipp...

Page 8: ...er Transport position Total implement width in the working position more than 3 m Total implement widht in the transport position see Techn Data Always swing the outer rotors in before transporting On...

Page 9: ...tention Check whether the lockinghooks 10 are locked into position correctly Using the tractor s lifting gear lower the implement far enough so that it stands on the ground on both centre running whee...

Page 10: ...hine with three point slewing headstock type N If the implement is being raised by the lifting gear whilst travelling in a curve the implement swings automatically into the central position Ifworkingo...

Page 11: ...ing of a single runner wheel Pressuptheadjusting lever 7 Swingthewheelstotheright or to the left Lock the adjusting lever into the desired position Note In this working position the swivel area 9 is u...

Page 12: ...use high pressure washers for the cleaning of bearing and hydraulic parts Danger of rust After cleaning grease the machine according to the lubrication chart and carry out a short test run Cleaning w...

Page 13: ...schedule Grease the lubrication nipples with universal grease after every 20 hours of operation Before leaving the machine over winter oil all the joints well and grease all bearings Intake transmissi...

Page 14: ...min 80 bar pressure max 180 bar 7 pole electric connection for lighting 12 Volt Description HIT 470 N H model ZK 2041 HIT 540 N model ZK 2051 Width of appliance in working position m 4 70 5 40 Workin...

Page 15: ...ion spring Standard at HIT 40 10 Gearbox Ihre Your Votre Masch Nr Fgst Ident Nr Position of Vehicle Identification Plate The factory number is imprinted on the accompanying Vehicle Identification Plat...

Page 16: ...GB Anhang Titelblatt _BA Allgemein GB Supplement...

Page 17: ...heap buy can sometimes be very expensive Be sure you purchase the Original with the cloverleaf sym bol Quality and precise fitting Operating safety Reliable operation Longer lasting Economy Guaranteed...

Page 18: ...bited a The transport of persons on the machine is not permitted b The machine may only be driven on public roads when in the position stipulated for road transport 7 Driving ability with auxiliary eq...

Page 19: ...on use clean and lubricate driveshaft For winter working grease the tube guards to avoid them freezing together Matching driveshaft to tractor To determine the actual length required hold the two halv...

Page 20: ...o protect the implement against damage Driving the right way will avoid triggering the clutch too often and thus causing unnecessary wear on it and the implement Lubricating interval 500 hrs Special l...

Page 21: ...plug let run out and duly dispose waste oil Before garaging winter season an oil change and greasing of all lubricating points has to be done Unprotected blanc metal parts outside joints etc have to...

Page 22: ...UNIFARM 15W 30 GEAROIL GP 80W 90 GEAROIL GP 85W 140 MULTI PURPOSE GREASE H FIBRAX EP 370 NEBULA EP 1 GP GREASE GEAR OIL GX 80W 90 GEAR OIL GX 85W 140 ULTRAMAX HLP 32 46 68 SUPER TRAC FE 10W 30 ULTRAM...

Page 23: ...fter every 8 hours operation 20h after every 20 hours operation 40 F all 40 loads 80 F all 80 loads 1 J once a year 100 ha every 100 hectares FETT GREASE Number of grease nipples IV see supplement Lub...

Page 24: ...24 0000 schmierplan 212 2 9400 schmierplAn 212 2 1 1 Variante Variante 3 3 3 3 3 2 4 HD SAE 90 0 5Liter h 1J 20 h 20...

Page 25: ...Stummel A Achtung Verwenden Sie Shell Spezial Getriebefett H 0 12 kg Montage du r ducteur pour andain D monter le prodecteur du bo tier renvoi d angle 10 Enfiler le r ducteur 11 sur le bo tier 10 et...

Page 26: ...t mounted implement front ballast distance from centre of gravity for combinedfrontmountedimplement front ballast to front axle centre Tractor wheelbase distance from rear axle centre to centre of low...

Page 27: ...he rear Record the calculated real and the permissible total weight given in the instruction handbook for the tractor into the table 5 CALCULATION OF THE REAL REAR AXLE LOAD TH tat Record the calculat...

Page 28: ...to the basic safety and health requirements of EEC Directions 98 37 if applicable and to the other relevant EEC Directions __________________________________________________________________________ t...

Page 29: ...randeringen van reeds geieverde machines kan worden afgeleid Technische gegevens maten en gewichten zijn niet bindend Vergissingen voorbehouden Nadruk of vertaling ook gedeeltelijk slechts met schrift...

Page 30: ...s P ttinger Maschinenfabrik Gesellschaft m b H A 4710 Grieskirchen Telefon 0043 0 72 48 600 0 Telefax 0043 0 72 48 600 511 e Mail landtechnik poettinger co at Internet http www poettinger co at Gebr P...

Reviews: