2
926.772.1 - GB/IE
INSTRUCTIONS PERTAINING TO THE USER
Dear Customer,
We are sure your new boiler will comply with all your requirements.
Do not dispose of this booklet as it contains the information, which will help you to run your
boiler correctly and efficiently.
POTTERTON GOLD HIGH OUTPUT
boilers bear the CE mark in compliance with the
basic requirements as laid down in the following Directives:
- Gas Directive 2009/142/CE
- Performance Directive 92/42/CEE
- Electromagnetic Compatibility Directive 2004/108/CE
- Low Voltage Directive 2006/95/CE
Do not leave any parts of the packaging (plastic bags, polystyrene, etc.) within children’s reach as they are a
potential source of danger.
1. Instructions prior to installation
3
2. Instructions prior to commissioning
3
3. Commissioning of the boiler
4
4. Filling the boiler
10
5. Turning off the boiler
10
6. Prolonged standstill of the system. Frost protection
10
7. Servicing instructions
10
8. General information
11
9. Instructions prior to installation
11
10. Boiler installation
12
11. Boiler size
13
12. Installation of flue and air ducts
13
13. Hydraulic system
16
14. Connecting the mains supply
20
15. Gas valve adjustment
27
16. Setting the boiler parameters
29
17. Control and operation devices
30
18. Positioning of the ignition and flame sensing electrode
31
19. Check of combustion parameters
31
20. Activating the chimney-sweep function
32
21. Annual service
32
22. Boiler schematic
33
23. Illustrated wiring diagram
34
24. Technical data
35
CONTENTS
INSTRUCTIONS PERTAINING TO THE USER
INSTRUCTIONS PERTAINING TO THE INSTALLER