6 Installation
6.1
General
Installation must be carried out in accordance with the prevailing
regulations, codes of practice and the recommendations in this manual.
6.2
Preparation
6.2.1
Accessing the internal boiler components
1. Remove the front panel by pulling firmly on the notches provided.
2. Lift and tilt the panel holding the control panel
Fig.34
MW-1000007-03
1
Fig.35
MW-1000008-04
2
6 Installation
36
7609493 - v08 - 24072018