32
Set Boiler to
M
aximum Rate
Allow the combustion to
stabilise. Do not insert probe to
avoid flooding the analyser.
Perform Flue Integrity
Combustion Check
Insert the analyser probe into
the air inlet test point, allowing
the reading to stabilise.
Is O
2
20.6% and
CO
2
< 0.2% ?
Verify Flue Integrity
Indication that products of
combustion &inlet air are
mixing - further
investigation is required.
C
hec
k
all flue components
are correctly assembled,
fixed & supported.
C
hec
k
the flue & terminal are
unobstructed.
Is O
2
20.6% and
CO
2
< 0.2% ?
TURN
APPLIANCE
OFF
!
C
all 0344
871
15
2
5
for
advice.
The appliance MUSTNOT
be commissioned until all
problems are identified
and resolved.
Check CO & Combustion
Ratio at
M
aximum Rate
Whilst the boiler is still
operating at maximum insert
the analyser probe into the
flue gas test point, allowing
the reading to stabilise.
Is CO < 350ppm
and CO/CO
2
ratio
< 0.004 ?
Verify Integrity of Seals
C
hec
k
all burner seals,
internal flue seals, door &
case seals. Replace any
seals that appear unsound.
Is CO < 350ppm
and CO/CO
2
ratio
< 0.004 ?
TURN
APPLIANCE
OFF
!
C
all 0344
871
15
2
5
for advice.
The appliance MUSTNOTbe
commissioned until all
problems are identified and
resolved.
If commissioning cannot be
fully completed the appliance
must be disconnected from the
gas supply in accordance with
the GSIUR.
Note:
C
hec
k
& record the
C
O
&combustion ratio at both
maximum &minimum rates
before calling 0344
871
15
2
5
.
Set Boiler to
M
inimum Rate
Allow the combustion to
stabilise. Do not insert probe
to avoid flooding the analyser.
Y
es
No
No
Y
es
No
Y
es
Check CO & Combustion
Ratio at
M
inimum Rate
Whilst the boiler is
operating at minimum insert
the analyser probe into the
flue gas test point, allowing
the reading to stabilise.
Y
es
No
Is CO < 350ppm
and CO/CO
2
ratio
< 0.004 ?
No
Y
es
BOILER
OPERATING
SATISFACTORILY. NO
FURTHER
ACTION
REQUIRED
Ensure test points are capped,
the boiler case front panel is
correctly fitted & secured and
all other commissioning
procedures completed.
C
omplete the Benchmar
k
C
hec
k
list, recording the
C
O &
combustion ratio readings as
required.
Checking Combustion
1
. Follow the flow chart opposite.
© Baxi Heating UK Ltd 2015