*All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
www.centralheating.co.uk
© Heating and Hotwater Industry Council (HHIC)
T
h
i
s
C
o
mmi
ss
i
o
nin
g
C
he
ckli
st
i
s
to
b
e
c
o
mpl
ete
d in full by
the
c
o
mp
ete
n
t
p
e
r
so
n
who
c
o
mmi
ss
i
o
n
e
d
the
b
o
il
e
r a
s
a m
e
an
s
o
f d
e
m
o
n
st
ra
t
in
g
c
o
mplianc
e
w
i
th
the
appr
o
pria
te
Buildin
g
Reg
ula
t
i
o
n
s
and
the
n
h
and
e
d
to
the
cu
sto
m
e
r
to
k
ee
p f
o
r fu
t
ur
e
r
e
f
e
r
e
nc
e
.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.
GAS B
O
I
L
E
R
SYSTEM C
O
MMISSI
ON
I
N
G C
H
ECK
L
IST
Customer name:
Telephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Gas Safe register number:
Company name:
Telephone number:
Company address:
Commissioning date:
C
ON
T
ROL
S
(tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and programmer/timer
Programmable room thermostat
Load/weather compensation
Optimum start control
Time and temperature control to hot water
Cylinder thermostat and programmer/timer
Combination Boiler
Heating zone valves
Fitted
Not required
Hot water zone valves
Fitted
Not required
Thermostatic radiator valves
Fitted
Not required
Automatic bypass to system
Fitted
Not required
Boiler interlock
Provided
A
LL
SYSTEMS
’s instructions
Yes
What system cleaner was used?
What inhibitor was used?
Quantity litres
Yes
No
CE
N
T
R
A
L
H
EATI
N
G M
O
DE
measure and record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (if applicable)
mbar
OR
Gas inlet pressure
mbar
°C
Central heating return temperature
°C
C
O
MBI
N
ATI
ON
B
O
I
L
E
R
S
ONL
Y
Is the installation in a hard water area (above 200ppm)?
Yes
No
Yes
No
D
O
MESTIC
HO
T WATE
R
M
O
DE
Measure and Record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (at maximum rate)
mbar
OR
Gas inlet pressure at maximum rate
mbar
Cold water inlet temperature
°C
Hot water has been checked at all outlets
Yes
Temperature
°C
I/min
C
ON
DE
N
SI
N
G B
O
I
L
E
R
S
ONL
Y
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798
Yes
A
LL
I
N
STA
LL
ATI
ON
S
Record the following:
At max. rate: CO ppm
A
N
D
CO/CO² Ratio
At min. rate: (where possible) CO ppm
A
N
D
CO/CO² Ratio
The heating and hot water system complies with the appropriate Building Regulations
Yes
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The operation of the boiler and system controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
www.centralheating.co.uk
62