12
INSTALLATION INSTRUCTIONS - Page 12
It is the law that all gas appliances are installed and
serviced by competent persons as stated in the Gas Safety
(Installation and Use) Regulations 1994.
Electrical installation and servicing should be carried out by
a competent person in accordance with the I.E.E. Wiring
Regulations.
For Health and Safety information see back page.
The boiler and its associated equipment will arrive on site in
two cardboard cartons. The contents of each carton is as
follows:-
CARTON 1
Boiler
Template
Side Infill Panels (2 off)
Literature Pack containing:
Installation & Servicing Instructions
Users Instructions
Control System Pipework and Wiring Guide Auxilliary Pack
containing
Gas Service Cock
Accessory Packs
Adjustment screws
CARTON 2
Inner Flue Product Tube
Outer Flue Product Tube
Air Box
Air Tube
Terminal
Boiler Mounting Plate
Figure 9 SECURING BOILER MOUNTING PLATE
Using wall plugs, screws and washers (accessory pack A)
attach boiler mounting plate to wall. Ensure that it is level
and the correct way round, i.e. flange on plate entering
hole in wall.
Figure 8 TEMPLATE
Place template in proposed boiler position, (the minimum
side clearances are automatically allowed
for).Refer to page 5 for top and bottom clearances which
can be measured from template. Ensure that the template
is level, mark hole positions ‘A’ and large flue outlet hole.
Remove template and carefully cut flue outlet hole through
wall.
DriII holes ‘A’ to a depth of 50mm using a 7mm drill.