10
TECHNICAL DATA - Page 10
Filling Point
The system shall be fitted with a filling point at low level
which incorporates a stop valve to BS1010 and a double
check valve
(approved by the National Water Council) to be fitted in this
order from the system mains. refer to Fig 7 METHOD 1.
Figure 5 OPEN VENTED FULLY PUMPED SYSTEM WITH A COMBINED FEED AND VENT
Figure 6 OPEN VENTED GRAVITY DOMESTIC HOT WATER PUMPED CENTRAL HEATING