INSTALLATION
Publication No. 5111817
8.8
Making The Electrical Connections
To connect the mains input cable proceed as
follows:-
1. Slacken the facia securing screws and lift the
outercase panel so that its securing tabs are clear of
the facia. Remove the panel.
2. Completely undo the screws securing the facia
panel and hinge it down (Fig. 22).
3. Remove the control box cover securing screws.
Disengage the barbs on the control box from the
cover. Remove the cover (Fig. 23).
4. Slacken the cable clamp on the LH side of the
boiler chassis (Fig. 24). Insert the cable through the
clamp and route it to the terminal block.
5. Slacken the screws in the terminal block, connect
the input cable, and tighten the screws.
6. If an external control is to be connected it can be
done at this point. Run the input cable from the
external control through the second cable clamp on
the boiler chassis. Refer to the instructions supplied
with the control.
7. To connect external control(s) remove the link
between terminals 1 & 2. The switched output from
the external control must be connected to terminal 2
(Fig. 25).
IMPORTANT:
The external control
MUST
be
suitable for 230V switching and fused 3A maximum
8. Ensure that both mains input and, where fitted,
external control input cables have sufficient slack to
allow the control box to drop down. Tighten the cable
clamp(s) on the boiler chassis.
8.9
Preliminary Electrical Checks
1. Prior to commissioning the boiler preliminary
electrical system checks should be carried out.
2. These should be performed using a suitable
meter, and include checks for Ground Continuity,
Resistance to Ground, Short Circuit and Polarity.
Always fit fast
blow 2A fuse
230V ~ 50Hz
fused 3A maximum
Live (brown)
Neutral (blue)
Earth (green/yellow)
1
2
230V S/L from
external control
br
b
g/y
bk
bk
L
230 V
Selector /
Reset Switch
External
Controls
N
br
b
Pump
Hydraulic Differential Pressure Switch
r
r
Safety Overheat Thermostat
Flue Thermostat
b
b
Central Heating Flow
NTC Sensor
r
r
Gas Valve
Spark Electrode
Condensate Trap
Flame Sensing Electrode
N
br
b
Fan
bk
bk
b
br
bk
Pressure Switch
b
br
bk
PCB
b
b
br
r
bk
bk
br
Central Heating Return
NTC Sensor
g
g
Gas Valve Modulator
Fig. 24
Fig. 23
Fig. 25
Fig. 26
Fig. 22
Terminal Block
Internal Fuse
Cable Clamp
Control Box Cover
Facia Panel
Functional Flow Diagram
Key to Wiring
b - blue
br - brown
bk - black
r - red
g - green