![Potterton Performa System 12 HE Installation & Service Instructions Manual Download Page 16](http://html.mh-extra.com/html/potterton/performa-system-12-he/performa-system-12-he_installation-and-service-instructions-manual_1583099016.webp)
7.0
SITE REQUIREMENTS
16
Publication No. 5111817
7.3
Ventilation of Compartments
1. Where the appliance is installed in a cupboard or
compartment, no air vents are required.
2. BS 5440: Part 2 refers to room sealed appliances
installed in compartments. The appliance will run
sufficiently cool without ventilation.
7.4
Gas Supply
1. The gas installation should be in accordance with
the relevant standards. In GB this is BS 6891. In IE
this is the current edition of I.S. 813 “Domestic Gas
Installations”.
2. The connection to the appliance is a 22mm
copper tail located at the rear of the gas service
cock (Fig. 7).
3. Ensure that the pipework from the meter to the
appliance is of adequate size. Do not use pipes of a
smaller diameter than the boiler gas connection
(22mm).
7.5
Electrical Supply
1. External wiring must be correctly earthed,
polarised and in accordance with relevant
regulations/rules. In GB this is the current I.E.E.
Wiring Regulations. In IE reference should be made
to the current edition of ETCI rules.
2. The mains supply must be 230V ~ 50Hz and
fused at 3A maximum.
NOTE:
The method of connection to the
electricity supply must facilitate complete
electrical isolation of the appliance.
Connection may be via a fused double-pole
isolator with a contact separation of at least 3mm
in all poles and servicing the boiler and system
controls only.
3. When the system includes an indirect domestic
hot water cylinder it is recommended that a cylinder
thermostat is used in conjunction with a
3 port 2 position valve or 2 port zone valve.
Fig. 7
Gas Service Cock