3
12/07/2011 - 300025089-001-B
NXR4i
2 Mounting
Tools required
- 1 22 box spanner
- 1 Phillips screwdriver
- 1 hammer
- 1 putty gun
- 1 stanley knife
- 13 - 19 - 24 spanners
- 1 Allen key (12 mm spanner)
- Assembly tool: JDTE Plus
Warning: Assemble the boiler in the order given by the
numbers of each figure, in compliance with all the
instructions.
Symbols used
Caution danger
Risk of injury and damage to equipment. Attention must be paid to the warnings on
safety of persons and equipment.
Specific information
Information must be kept in mind to maintain comfort.
Z
Reference
Refer to another manual or other pages in this instruction manual.
Summary of Contents for NXR4i
Page 1: ...Working towards a cleaner future NXR4i Assembly Instructions August 2011 heating specialists ...
Page 5: ...5 12 07 2011 300025089 001 B NXR4i 1 2 M001233 C C003341 A 1 2 ...
Page 8: ...8 NXR4i 12 07 2011 300025089 001 B 7 8 3 Silicon supplied C003348 C C003349 B 1 100 ...
Page 16: ...16 NXR4i 12 07 2011 300025089 001 B 17 18 10x C003362 B M12 8x C003363 B ...
Page 21: ...21 12 07 2011 300025089 001 B NXR4i 25 C003419 B 1 2 2 0 12 ...
Page 26: ...26 NXR4i 12 07 2011 300025089 001 B 32 Mounting of the rear insulation C003372 A C003376 B ...
Page 29: ...29 12 07 2011 300025089 001 B NXR4i 38 39 L000068 C003421 A 1 1 2 C003420 B 4 3 5 7 8 8 7 7 6 ...
Page 30: ...30 NXR4i 12 07 2011 300025089 001 B 40 2x M5 C003423 B ...
Page 32: ...32 NXR4i 12 07 2011 300025089 001 B 42 43 C003427 A C003428 A 2 1 4x M5 x 25 ...
Page 35: ...35 12 07 2011 300025089 001 B NXR4i 47 48 C003433 A C003439 A ...
Page 36: ...36 NXR4i 12 07 2011 300025089 001 B 49 C003440 A ...
Page 38: ...38 NXR4i 12 07 2011 300025089 001 B ...