
POTTERTON COMMERCIAL PRODUCTS DIVISION
SECTION 4
INSTALLATION, OPERATION & MAINTENANCE MANUAL
NXR3
PAGE 13
Fig. 6 – Boiler Fittings Assembly
1
Front Section
14
Distributor (6&7 section)
25
Sight Glass Flange
2
Intermediate Section
14a Distributor (8&9 section)
26
Sight Glass & Seal
3
Rear Section
15
Flow and Return Manifold
27
Door Seal (Ø16)
4
Nipple (Ø89)
16
Drain Valve
28
Burner Plate
5
Sealing Cord (Ø7)
17
Sensor Pocket (100mm length) 29
Burner Plate Gasket
6
Tie Rod
18
Upper Baffle
30
Cleaning Door
7
Reducer
19
Flue Hood (180mm outlet)
31
Internal Insulation
8
Sensor Pocket (200mm length) 19a Flue Hood (200mm outlet)
32
External Insulation
9
Door Hinge
20
Flueway Hatch (left)
33
Section Insulation Blanket
9a
Door Hinge
20a Flueway Hatch (right)
39
Cleaning Brush
10
Door Guide
21
Sealing Rope
40
Bag of Screws
11
Door Pin
22
Chamber Door
42
2” Blanking Plug
12
Welding Flange
23
Internal Insulation
13
Flange Gasket
24
External Insulation