INDEX
SECTION 1
Page
Fig 1
- General Data & Dimensions
1
Table 1 - Boiler Dimensions
1
Table 2 - Combustion Chamber Data
1
Table 3 - Technical Data
2
- Technical Data
3
Fig 2
- Base Details
4
- Clearances/ Burner Information
4
Fig 3
- Boiler Water Connections (6-7 Sect)
5
Fig.4
- Boiler Water Connections (8-15 Sect) 5
SECTION 2
- General Information
6
- Installation
7
- Boiler Siting and Base
7
SECTION 3
- Ventilation
8
- Flue
8
- Flue Size Considerations
8
- Water Circulation Systems
8
- Boiler Protection
9
- System Water Quality
9
SECTION 4
- Boiler Erection
10
- Risk Assessment
10
- C.O.S.H.H.
11
- Erection/Assembly Check List
11
- Waterway Sealing
12
- Erection Procedure
12
Table 4 - Section Build Data/Boiler Sealant
Details
13
Fig.5
- Waterway Sealing Details
13
- Checking For Leaks
14
- Boiler Dismantling
15
- Fitting the Casing
15
Fig.7
- Boiler Insulation
15
Fig.8
- Fitting Locknuts to Studs
15
Fig.9
- Front Panel Fixing
15
Fig.10
- Door Fixing
16
Fig.11
- Door Micro Switch
16
Fig.12
- Firing Door Casing & Insulation
16
Fig.13
- Control Panel
17
Fig.14
- Rear Casing
17
Fig.15
- Boiler Side Rails
17
Fig.16
- Boiler Side Panel Fixing
17
Fig.17
- Side/Front Panel Fixing
18
- Fitting the Inserts
18
- Insert Removal
18
- Boiler Tool Storage
18
- Cafco Blaze Preparation
19
Table 5 - Insert Dimensions
19
Fig.18
- Insert Position
19
SECTION 5
Page
- Boiler Maintenance
20
- Cleaning of Flue Surfaces
20
- Class ‘D’ Fuel Oil
20
- Classes ‘E’ and ‘F’ Fuel Oils and
20
Sludge Gas
- Boiler Ancillaries
20
- Boiler Controls
21
- Commissioning
21
- Additional Checks
22
- Combustion Analysis (NG)
22
- Burner Fan Rotation
22
- Fault Finding
22
- Overheat Operation
22
- Burner Lockout
22
SECTION 6
Fig.20
- Control Panel Wiring
23
Fig.21
- Pump Overrun Using Changeover
24
Pipe Thermostat
Fig.22
- Volt Free Connections
24
SECTION 7
- Casing Pack Details/Part Nos.
25-
29
Summary of Contents for Isis HE
Page 1: ...MAY 2004 ...