32
© Baxi Heating UK Ltd 2016
11.0 Completion
11.1
Completion
1. Instruct the user in the operation of the boiler and
system explaining the operational sequence.
2. Set the central heating and hot water temperature
control knobs to the requirements of the user.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event of
any warranty work. The publication must be handed to the
user for safe keeping and each subsequent regular service
visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions giving advice on the necessity of
regular servicing.
Facia Panel
Case Front Panel
10.0 Commissioning
10.3
Check the Operational (Working) Gas Inlet
Pressure
(cont.)
13.
Working Gas Pressures
If the pressure drops are greater than shown in Fig. 43a a
problem with the pipework or connections is indicated.
Permissible pressure drop across system pipework 1 mbar.
EV1
EV2
P.
OUT
1 2 3 4
VENT
RQ ADJ.
Gas Cock
Gas Valve
Gas Meter
19-23 mbar
17-21 mbar
Fig. 43a