EVD-S

ELECTRONIC VIBRATION DETECTOR

SYSTEM

INSTALLATION (SEE FIGS. 1, 2, 3, 4, 5, 6 and 7)

The device must be installed in accordance with all applicable local codes.  Battery must be charged for 48 hours before
putting unit into service.

1. Mount EVD-C.
2. Mount pickup units and wire according to installation drawing.
3. See Figs. 2 and 4 for connection of remote test unit Model PTU-B and/or central station test unit, if applicable.
4. Connect BLACK battery lead to NEGATIVE battery post and RED battery lead to POSITIVE battery post.
5. Plug transformer to unswitched 110VAC outlet and apply 12VAC to terminals 1 and 2 of EVD-C.

NOTES: A. Maximum of 15 pickups on loop.

B. Pickup loop not to exceed 1,000 ft. of #22 AWG, two conductor shielded cable.

SENSITIVITY ADJUSTMENTS:

1. Adjust the pickup loop sensitivity control to 1/2 scale (6 o'clock position).
2. Perform simulated attack tests on all accessible surfaces, protected by EVD-P's, utilizing a plastic mallet or the plastic

handle of a large screwdriver. An alarm condition (as indicated by the red LED) must occur.
NOTE:  Extreme care should be exercised so that the protected surfaces are not marred or damaged while performing
attack test.
If necessary the pickup loop sensitivity may be adjusted to obtain reliable test results. The sensitivity control may not
be adjusted to less than 1/2 scale for safe applications.

3. Perform attack test on EVD-C housing and adjust “housing” sensitivity control for desired protection.

CAUTION:

Housing sensitivity is adjustable to an “off” condition. 

Never leave the unit in this unprotected condition!

TESTING

Pressing Test button on front of EVD-C induces a test signal into the EVD-C amplifier. An alarm condition indicated by a
Red LED adjacent to the test button must occur. 

If a Model APC-B Accumulator has been installed, the test button must

be held in approximately 30 seconds before the unit will go into the alarm condition.

Operation of the system can be verified from a remote location by use of an optional PTU-B and/or a Central Station Test
Unit.
The subscriber must be instructed to test the system each time the alarm is set per instructions on front of EVD-C.

UL CERTIFICATED SAFE APPLICATIONS

The following conditions must be met to qualify for an Underwriters Laboratories complete safe certificate:

• A minimum of 2 EVD-P pickup units required for all applications (see exception).
• COMMERCIAL BURGLARY SAFES must be constructed of a minimum 1/4" steel for the body of the safe and 1/2" for

the door. Burglary safes exceeding 20 cubic feet in size must have an additional EVD-P pickup for every additional 10
cubic feet.

• COMMERCIAL FIRE SAFES exceeding 44 cubic feet in size must have an additional EVD-P pickup for every additional

22 cubic feet.

• (EXCEPTION) UL LISTED TRTL and TXTL SAFES:  One pickup may provide protection for a safe not exceeding 36 cubic

feet. An additional pickup unit is required for each additional 36 cubic feet or portion thereof.

EVD-P

REQUIREMENTS

1

EVD-P

2

EVD-P

3

EVD-P

ADDITIONAL

EVD-P

BURGLARY
SAFES

Not

Permitted

20 Cu Ft

or less

30 Cu Ft

or less

1 EVD-P for each

additional 10 Cu Ft

FIRE SAFES

Not

Permitted

44 Cu Ft

or less

66 Cu Ft

or less

1 EVD-P for each

additional 22 Cu Ft

TRTL/TXTL
SAFES

36 Cu Ft

or less

72 Cu Ft

or less

108 Cu Ft

or less

1 EVD-P for each

additional 36 Cu Ft

Summary of Contents for EVD-S

Page 1: ...plug in transformer and a regulated battery charging circuit maintain the standby battery at a fully charged state An auxiliary output is provided to power the APC B accu mulator option when required The battery provides in excess of 80 hours standby operation even if the maximum 6VDC auxiliary output is utilized The EVD C provides an AC on indicator green LED a test button and an alarm indicator ...

Page 2: ... an off condition Never leave the unit in this unprotected condition TESTING Pressing Test button on front of EVD C induces a test signal into the EVD C amplifier An alarm condition indicated by a RedLEDadjacenttothetestbuttonmustoccur IfaModelAPC BAccumulatorhasbeeninstalled thetestbuttonmust be held in approximately 30 seconds before the unit will go into the alarm condition Operation of the sys...

Page 3: ...d 3 Remove jumper on terminals 12 and 13 if remote test unit Model PTU B is used 4 Battery Design life 4 years Mark date on battery and charge for 48 hours before putting unit into service Only Elpower Altus EP640 Power Sonic Corp PS640 or PS642 Panasonic LCR6V4P and Eagle Picher CFM6V4 6 may be used on UL Listed installations 5 Output terminals 8 and 9 for powering APC B accumulator if required T...

Page 4: ...n Power Limited See Fig 7 Suggested Wire Routing FIG 3 TYPICAL VAULT INSTALLATION PTU B must be used if EVD C is mounted inside vault EOLR resistor assembly installed in last pickup 1 Ground terminal 3 to cold water pipe and use shielded cable for pickup loop and remote test unit to reduce RFI 2 Central Station Test Dry contact closure across terminals 10 and 11 will initiate test Not applicable i...

Page 5: ...D S ELECTRONIC VIBRATION DETECTOR SYSTEM RECOMMENDED EVD P SPACING WALL CONSTRUCTION TYPE FEET POURED CONCRETE 10 PLASTERBOARD 20 CONCRETE BLOCK 20 BRICK 10 FIG 5 TYPICAL EVD P SYSTEM WIRING FOR WALL PROTECTION FIG 6 RECOMMENDED EVD P SPACING FOR CONCRETE BLOCK WALL ...

Page 6: ...are Class 2 Power Limited All field wiring connected to this panel must maintain a spacing of 1 4 between all Class 2 Power Limited conductors and Class 1 and or Non Power Limited conductors The enclosure is provided with multiple cable entry openings so that Class 2 Power Limited conductors can be segregated from Class 1 and or Non Power Limited conductors NOTE If Class2Power Limited conductorsar...

Reviews: