background image

I

NSTALLATION

, O

PERATION

& M

AINTENANCE

M

ANUAL

 

 HOME PLATE w/ ANCHOR & PLUG No. 33200 

HOME PLATE w/ SPIKES No. 33201 

BASEBALL BASE w/ ANCHOR & PLUG 

(SET OF 3)

 No. 33210 

BASEBALL BASE w/ ANCHOR & PLUG 

(SET OF 3)

 No. 33211 

PITCHERS' PLATE No. 33220 

 PITCHERS' PLATE w/ SPIKES No. 33221 

INST 00447 058 

¤

 2008  PORTER ATHLETIC, INC.  ALL RIGHTS RESERVED. 

5-1-2008

Porter No. 33200

Porter No.   33211 

Porter No. 33201

Porter No.   33220

Porter No.   33221

Porter No.   33210 

Summary of Contents for 33200

Page 1: ...EBALL BASE w ANCHOR PLUG SET OF 3 No 33210 BASEBALL BASE w ANCHOR PLUG SET OF 3 No 33211 PITCHERS PLATE No 33220 PITCHERS PLATE w SPIKES No 33221 INST 00447 058 2008 PORTER ATHLETIC INC ALL RIGHTS RESERVED 5 1 2008 Porter No 33200 Porter No 33211 Porter No 33201 Porter No 33220 Porter No 33221 Porter No 33210 ...

Page 2: ...accounted for Inspect all components for possible damage Report any shortages to Porter s Customer Service Department immediately Failure to report shortages or damage directly to Porter s Customer Service Department within three working days will place the financial burden for the missing or replacement parts with the installer or general contractor NOTE ALL PRODUCTS SHOULD BE INSPECTED SEMI ANNU...

Page 3: ...box until flush with the top edge The anchor stake should be approximately 3 above the top edge of the box Allow a minimum of 24 hours for the concrete to fully cure before removing the form box and installing into footing location 3 Make sure the baseball diamond is level before excavating footing location 4 Excavate footing location minimum 9 deep from ground level Top edge of the anchor stake s...

Page 4: ...uld be approximately 3 3 4 above the top edge of the box Allow a minimum of 24 hours for the concrete to fully cure before removing the form box and installing into footing location 3 Make sure the baseball diamond is level before excavating footing location 4 Excavate footing location minimum 9 3 4 deep from ground level Top edge of the anchor stake shall be a minimum of 1 below level grade Ancho...

Page 5: ... should be approximately 3 above the top edge of the box Allow a minimum of 24 hours for the concrete to fully cure before removing the form box and installing into footing location 3 Make sure the baseball diamond is level before excavating footing location 4 Excavate footing location minimum 9 deep from ground level Top edge of the anchor stake shall be a minimum of 1 below level grade Anchor st...

Page 6: ...neral contractor 2 Install the five 5 4 long metal spikes supplied with home plate to the bottom side of plate 3 With home plate s position determined excavate location 1 below level ground and approximately 1 larger than the dimensions of home plate 4 With the five 5 spikes pointing toward the ground and the home plate oriented correctly push the home plate into the ground Note the topside of the...

Page 7: ...2 Install the three 3 4 long metal spikes supplied with pitchers plate to the bottom side of plate 3 With the pitchers plate s position determined excavate location 1 below ground and approximately 1 larger than the dimensions of pitchers plate 4 With the three 3 spikes pointing toward the ground and the pitcher plate oriented correctly push the pitchers plate into the ground Note the topside of t...

Page 8: ...ion 6 below ground and approximately 1 larger than the dimensions of pitchers plate 3 With the pitchers plate oriented correctly within the excavated footing the topside of the pitchers plate shall be no higher or lower than the grade of the pitchers mound See Detail F 4 Backfill excess excavation as required www porterathletic com 888 277 7778 SAVE THESE INSTRUCTIONS FOR FUTURE USE DETAIL F WARNI...

Reviews: