15
20.
Next, assemble left-hand base side pad (#19) so that front edge of pad is flush with base front filler pad (#18) (from Step No. 18),
as shown in Detail "H". Note – Bottom edge of pad must be flush with bottom edge of base (bottom edge of pad will be
approximately 4" off the floor). Repeat for assembling right-hand base side pad (#20). See Detail "H".
21.
Next, slide base enclosure panel (#21) into base, on rails located on both sides of base, with cutouts positioned toward front of
backstop. See Detail "H".
ASSEMBLY OF PADDING AND ENCLOSURE PANEL IS NOW COMPLETE.
Detail "H"
Support Rail for Base
Enclosure Panel (#21)
From Step No. 18
18
19 Left Hand (Shown)
20 Right Hand (Not Shown)
21
22
24