Rafters and Stringers

Step 4:

Install the remaining

rafters

. Place

each

rafter

on the

marks

on the

main beam

and fasten with

3 ½”

screws.

Note: All the

rafters should measure 24” from center to
center of rafters.

Step 3:

The top of the

rafter

should be about

¼ - ½”

higher than the top of the

king post

.

Fasten the top of the

rafters

to the

king post

with

2 ½”

screws in each predrilled hole.

Step 5:

Install the

2x4 stringers

on the

rafters

.

The

rafters

and

stringers

are notched to fit

together. Keep the first row of

stringers

flush

with the ends of the

rafters

.

Step 6:

Install the

stringers

in the notches in

the

rafters

, making sure the

rafters

are fit into

the notches in the

stringers

. Fasten with

2 ½”

screws in the predrilled holes.

Step 2:

Fasten each end of each

rafter

to

the

main beam

with

3 ½”

screws through

the predrilled holes.

Step 1:

Begin by installing the 2

rafters

with no

rafter tie

, on each end of the

main beams

as

shown. The

inside edge

of the

rafter

should be

flush with the

outside edge

of the

cross beam

.

Summary of Contents for AMISH COUNTRY GAZEBOS Pavilion-in-a-Box

Page 1: ...www AmishGazebos com 1 800 700 1777 12x15 Pavilion in a Box Assembly Instructions...

Page 2: ...ntents of your kit or installation of your pavilion please contact our Customer Service department at 800 700 1777 Ext 4 Hours of operation are Monday Friday 8 30 AM 4 00 PM Eastern Standard Time 8 pc...

Page 3: ...3 12x15 Pavilion in a Box Parts List...

Page 4: ...3 Align the 2 cuff sides at one end and fasten with a 2 screw through a predrilled hole Step 5 Now put the second wide cuff side into place as shown and fasten with a 2 screw through each predrilled h...

Page 5: ...lace the long sides of cuff bottom along the wide cuff sides Step 9 Turn the cuff assembly around and place a cuff top on the other end Again the wide part of cuff top should face up And long side of...

Page 6: ...one angled end of the outside ply Place it so the ends line up Step 4 Place a post on the end of beam The center ply of the post should fit next to the center ply end Step 5 Be sure the post is fitted...

Page 7: ...Drive 3 additional 2 screws through the inside ply long into the outside ply Place the 3 screws just beside the splice in the outside ply so the ends of each outside ply is secured Step 11 Place the s...

Page 8: ...face down The predrilled holes in the king post should face up Step 16 The ends of the inside ply should be 1 3 8 back from the end of the outside ply Step 17 Be sure each ply is flush on the bottom t...

Page 9: ...each other Step 5 Lift a cross beam in place The outside ply of the cross beam should overlap the inside ply of the post Step 6 Be sure to line up each beam at the bottom then fasten with 2 screws in...

Page 10: ...2 brackets on each post Now anchor the posts to your foundation If anchoring to concrete drill 3 8 holes and use the provided 3 8 x 2 concrete anchors If anchoring to a wood or composite surface then...

Page 11: ...the short side place the brace on the inside ply of the cross beam at the top and flush with the outside edge of the post at the bottom Then fasten with 3 screws in each predrilled hole Step 6 Install...

Page 12: ...n the predrilled holes Step 1 Start at the center of the main beam on top Measure and mark 11 16 from the center both ways The 2 marks should then be 1 3 8 apart Step 2 Measure every 2 from the first...

Page 13: ...tringers on the rafters The rafters and stringers are notched to fit together Keep the first row of stringers flush with the ends of the rafters Step 6 Install the stringers in the notches in the raft...

Page 14: ...aight cut end flush with the faceboard and the top of the rake flush with the top of the stringers Fasten to the faceboard and stringers with 2 screws Step 6 Install the remaining rake Line up the rak...

Page 15: ...same side The gutter apron should be flush with the outside edge of the rake at each end and the gutter apron in the center should overlap the other two about 4 Fasten each gutter apron with 3 roofin...

Page 16: ...e lip is overlapping the side of the first panel with a lip Step 9 Keep the second panel flush on the bottom and fasten in the same way as the first panel Follow the previous steps to install the rema...

Page 17: ...under the angled cut at the roof peak Also make sure it is flush at the bottom Step 6 Fasten both metal rake with 1 metal roofing screws Fasten with a screw into each stringer and 4 screws into the 2x...

Page 18: ...etal roofing screws into each rib of the metal roof panels Step 3 Install the second ridge cap at the opposite end of pavilion Be sure the end of the ridge cap is flush with the outside edge of the me...

Reviews: