Peristaltic Pump Service Procedure
1.
Flush the feed pump and tubing with fresh water. The filtration system must be running
to perform this task. Change filtration mode to ON if required, and use the ACID PRIME
or LCHL PRIME function in the ASP TOOLS menu to flush water through the tubing.
a) Loosen the fume stop cap to relieve any pressure in the drum.
b) Remove the drum cap, and place end of feed line into a bucket of fresh water.
c) On the chlorinator control panel, press and hold VIEW until the MAIN MENU appears.
d) Navigate to ASP TOOLS and press VIEW (ASP TOOLS menu appears)
e) Navigate to ACID/LCHL PRIME and press VIEW
f) Press VIEW to start the feed pump (60 second timer)
g) Allow PRIME to finish, and repeat.
h) Press BACK button at least 3 times to return to the HOME VIEW.
Note: This procedure is never guaranteed to flush all chemicals from the
system, especially if the pump has not been performing well. Always wear
appropriate protective clothing and proceed with caution when handling
liquid chlorine and/or acid while servicing the dosing system.
2.
To prepare the system for servicing, turn OFF and disconnect the filtration pump. Relieve
the plumbing of any pressure or vacuum.
a) Change the FILTRATION MODE to OFF using the MODE button.
b) Disconnect the filtration pump power cord to prevent accidental start up.
c)
If the acid injection point is below water, close both suction and return isolation valves.
d) * Relieve any pressure or vacuum from the plumbing section that has the injection point, and
drain enough water from the plumbing system so that the injection point is above the water
level.
*
The procedure for (d) depends on your system components and configuration.
3.
Remove the old squeeze tube and rollers, and discard old parts.
a) Loosen and remove both lock nuts securing feed tubing to the pump, and disconnect both
feed tubes.
b) Remove 2x screws (1, 2) securing the clear plastic outer cover (3), and remove cover.
c) Remove old squeeze tube (10) and discard.
d) Remove outer rotor half (4) and discard.
e) Remove 4 x rollers (5,6,7,8) and discard.
f) Remove inner rotor half (9). This may require a flat head screw driver or similar as a lever.