6
PCU 4131
PCU 8130
Mounting
6.
The IP Streamer must be installed in a well-ventilated room. The ambient temperature must not exceed 45 °C.
It must be ensured that air can circulate freely through the ventilation holes, this applies especially with
horizontal 19" mounting. In order that the air can circulate freely, a minimum distance of at least 15 cm from
the ventilation holes must be maintained. The mains plug must be pulled out for installation or when working
on the wiring.
= Heat accumulation!!!
6.1. Grounding
The device must be grounded in accordance with EN 60728-11.
-
Strip the cable insulation of the grounding cable (4 mm
2
) by approx. 15 mm.
-
Push the stripped end under the grounding screw and tighten the screw firmly.
15 cm
15 cm
12V on/off SAT tuner
1 / 2
12V on/off SAT tuner
5 / 6
12 V on/off tuner
4 Terr.
12 V on/off tuner
8 Terr.
J1 > 12V on/off
SAT tuner 1
J3 > 12V on/off
tuner 4 Terr.
J2 > 12V on/off
SAT tuner 2