EZ2014
-
FRAME CONNECTOR PKG, EZ
BILL OF MATERIALS
DESCRIPTION
ITEM CODE
QTY
ID
X-BRACE
EZ1100
4
1
PURLIN, BASKET, 73 1/2"
GM4000
3
2
SLIDE BAR, GM 2000
GMSA52
2
3
ASSY, S.A. BOTTOM RAIL, 74"
SA4013
2
4
ASSY, S.A. TOP RAIL, 74" (BROWN)
SA4018
2
5
3'-0" x 55 1/4" 8MM CLR PCSS
SS1005
4
6
CARRIAGE BOLT, 1/4"x 3/4", G5
NB1820
4
7
WASHER, LOCK, 1/4" ZP
NB1860
4
8
WING NUT, 1/4" ZP
NB1902
4
9
SNAPPER PIN, .250" x 2.25"
NB1996
2
10
CONNECTING THE FRAMES
13
REV: AE-201007
1. Raise the DOOR FRAME SUBASSEMBLY into upright
position and open the door to use as a 'kick stand'.
3
9
9
1
9
8
7
9
8
7
6
6
5
4
8
7
1
1
5
4
6
6
2
2
7
10
8
1
3
2
2. Raise INTERMEDIATE FRAME ASSEMBLY into
upright position and attach (2) Purlins (GM4000)
to connect the two frames as shown.
(Note: for an EZ5006 10' x 6' structure, your 2nd
and final frame will be an END FRAME ASSEMBLY.)
2
2
DOOR FRAME
SUBASSEMBLY
INTERMEDIATE
FRAME
SUBASSEMBLY