background image

Upper Rope Hook Installation

Lower Cradle and Hook Installation

DETAIL  A

DETAIL  B

Side Vent Installation - Part 1

29

AK-210302

29

A

B

Note: 
      1. Dimension is to and from center
          of bracket.

Note: 
      1. Roof Poly removed for clarity.
      2. Dimension is to and from edge
          of bracket.

RC1311
Bracket Assy 
With S Hook

NB1805
Long
Self-Drill Screw

(Side) WWBASE with
Poly and Wiggle Wire

NB1807
1 1/2" x #9 
Woodtight

Wood

Skirt

1

2

1. Install 6X 

RC1311

 on top of (Side) WWBASE (over Poly)

    using 1X 

NB1805

 each.

 
2. 

Install 5X 

RC1330

 along Wood Skirt using 2X 

NB1807

.

 

RC1330
Cradle Assy w/Hook

Summary of Contents for FC3000

Page 1: ...embly Instructions Movable Range Coop 20 x 36 FC3000 P O Box 458 27725 Danville Avenue Castle Rock MN 55010 www poly tex com U S Canada Toll Free 800 852 3443 651 463 7009 fax 651 463 2479 REV AK 2103...

Page 2: ...ction as an anchorage point for a fall arrest system Use a safety net or work from a safe work platform i e scaffolding Select a calm day for work Wind can be sufficient enough to knock materials or w...

Page 3: ...CAPACITY OF THE STRUCTURE FOR SNOW WIND SEISMIC OR OTHER LOADS UNLESS BUYER HAS RECEIVED CERTIFIED ENGINEERING DRAWINGS WITH THE STRUCTURE POLY TEX INC DOES NOT WARRANT THAT FRAME WILL COMPLY WITH LO...

Page 4: ...Tube w Swage 116 RC1319 Roll Up Crank 84 HP3506 HT Diagonal Brace 78 HP3557 9 7 2 0 x 14 ga RR2109 9 8 R F U Channel w Swage HP3340 9 8 Truss Purlin w Swage Red HT2161 Skid Rail Swaged 9 x 6 1 66 HT2...

Page 5: ...der FC1003 Poultry Peak 20 2 0 FT4040 2 x 1 375 Cross Set w Bolts HT1085 Roll Up DR Vent Tube 80 FC1001 2 Tie Post 1 x 5 HT1076 Door Jamb Extension 24 HT1023 34 1 2 STRUT FT4041 1 375 Brace Band HY202...

Page 6: ...rlin Fastener PT2200 Earth Anchor 30 HTA1058 Anchor Rod HTA1034 Skid Insert RC1330 Cradle Assy Short w Hook RC1311 Bracket Assy With S Hook HTA1064 Anchor Rod Shackle 5 RC1303 U Joint w Bolts HY2026 U...

Page 7: ...1 1 2 Rect Blk Plug 16 ga RC1406 Nylon Rope 1 4 x 66 DR6038 Door Swinging Assembly 4 x 6 8 DR2410 Door Poly Reinforced 60 x 96 SC303890K HGLS Shade 30 x 38 90 Blk HGLS KHR36 20TW 36 x 38 White Top GM...

Page 8: ...NB1832 Carriage Bolt 5 16 x 1 1 4 G5 NB1863 Flat Washer 3 8 zp NB1864 Lock Washer 3 8 zp NB1874 Hex Nut 3 8 zp NB1886 Flat Washer 5 16 zp NB1862 Lock Washer 5 16 zp NB1872 Hex Nut 5 16 zp NB1805 Self...

Page 9: ...Frame Truss Wind Brace at 4 corners Cross Brace at each frame Door Frame Peak Purlin Eave Purlin each side Intermediate Purlin each side Equipment Rails x3 Door Roll up Gable Vent End Wall Poly Roof...

Page 10: ...ng 1x HT2104 and 2x HT2105 for each side Ensure that the hold down tubes face the outside of the structure see Detail A 2 Install 1x HTA1034 at each end of rail secure connections using 2x NB1809 scre...

Page 11: ...y measuring diagonally across the structure from corner to corner When the two measurements are equal the structure is square 3 Assemble cross braces using 2X FC1001 and 1X HP3557 secure each connecti...

Page 12: ...race base to hold 20 0 dimension while completing next step If this dimensions isn t maintained attachment of the frames will be difficult 3 For 2 End Frames Install 2X NB1809 self drilling screws at...

Page 13: ...center before tightening any hardware 1 Slide one FT4041 onto each HT1015 and HT1016 for use in a step 7 2 Join HT1015 and HT1016 using 2X NB1809 see Detail A 3 Slide 4X HY2027 onto the Basic Frame tw...

Page 14: ...ed plumbed and leveled 1 Place 1X Basic Frame on first stubs of the Skid Rails 2 Place an Intermediate Frame on the second set of stubs 3 Install HP3506 between the intermediate frame and the next stu...

Page 15: ...16 Lock Washer 1 End frame 2 2 3 FT2108 1 1 2 Uni Pipe Clamp NB1809 1 Self Drill Screw 1 Install first Eave Purlins RR2109 flush with end frame 4 1 1 4 from lower face of Skid Rail Reference Detail A...

Page 16: ...RR2109 NB1809 1 Self Drill Screw FT2108 1 1 2 Uni Pipe Clamp Intermediate Frame End Frame 2 1 Continuing from Ridge Eave Purlin Assembly Part 1 Add additional purlins RR2109 to extend past end frame J...

Page 17: ...ediate Frame HP3340 1 1 2 3 1 Install first piece of HP3340 flush to outside of End Frame approx 4 2 7 8 from break at the top of FC1002 Connect HP3340 to End Frame using KH1000 Install RS5000 Plug in...

Page 18: ...g RS5000 End Frame 1 3 Intermediate Purlins 2 KH1000 3x NB1809 1 Self Drill Screw 1 Continuing from Intermediate Purlin Assembly Part 1 Join sections of HP3340 using 1X NB1809 see Detail C 2 Attach In...

Page 19: ...73 HT2143 HT1076 DR5082 HP3420 DR5082 DR5082 DR5073 NB1809 1 Self Drill Screws 1 2 4 3 4 To form the adjustable end frame components slide HT2143 into DR5082 and slide HT1076 into HP3420 1 Install HP3...

Page 20: ...op of the frame trusses with the open side of the roll formed channel up 1 Install 2X Outer Equipment Rails using RR2109 on top of Intermediate Frame Trusses Ends will connect to End Frame verticals w...

Page 21: ...w Lumber 2 x 6 FT2106 NB1809 1 Self Drill Screw NB1807 Wood Screw 1 Install 2 x12 Skirt along rails on each side of structure Skirt will sit on top of the holddown tubes during install 2 Attach Skirt...

Page 22: ...SE9 where possible All WWBASE9 will be secured using NB1809 at 18 spacing 1 Install WWBASE9 along Eave Purlin Netting can be secured along inside of Wood Skirt and filler using staples 2 Install WWBAS...

Page 23: ...as shown while maintaining tension on the Poly Film Bend the Wiggle Wire up just enough to clear the edge of the Wiggle Wire Base Continue feeding the Wiggle Wire into the Base keeping the Poly Film...

Page 24: ...eeping the Poly tight along WWBASE9 as WIGLWIRE is installed 4 Install WIGLWIRE on End Frame verticals 5 Install WIGLWIRE at base of End Frame 6 Using a short piece of WIGLWIRE reinforce all corners 7...

Page 25: ...and the Peak of the Gable left open RC1311 attached to Peak Header using NB1805 1 1 2 Self Drill Screws DR2410 Poly RC1311 Angle Bracket with S Hook NB1805 1 1 2 Self Drill Screw Peak Header Wiggle Wi...

Page 26: ...e Tied at Eye Bolts 6 2 Continuing on from Gable Vent Assembly Part 1 1 Join HT1085 with RC1319 using RC1303 and included hardware 2 Wrap DR2410 around HT1085 and use 3x RC1010 Clips to hold DR2410 in...

Page 27: ...this happens it may be necessary to re tension the Poly and adjust the Wiggle Wire as needed at a later date 1 2 3 1 Lay out sections of Wiggle Wire around the perimeter of the structure so they are...

Page 28: ...first side 2 Begin installing Wiggle Wire at point B Center of the structure and work down to point A 3 Moving to the other side of the structure begin installing Wiggle Wire at point E working one s...

Page 29: ...cket Note 1 Roof Poly removed for clarity 2 Dimension is to and from edge of bracket RC1311 Bracket Assy With S Hook NB1805 Long Self Drill Screw Side WWBASE with Poly and Wiggle Wire NB1807 1 1 2 x 9...

Page 30: ...sing 1X NB1809 at each joint 2 Mark the hanging poly 54 below the Wiggle Wire Base 3 Wrap the hanging poly around the roll up tubes CF1014 and use RC1010 Clips spaced 36 apart to hold poly in place us...

Page 31: ...llation 31 AK 210302 31 Shade Fabric 1 Install Shade Fabric using same process used for Roof Poly Installation Shade fabric can be attached to Wiggle Wire Base the same way Poly is installed with addi...

Page 32: ...ach the door latch kit drill 3 8 thru bolts at attachment locations and use 5 16 x 2 1 2 Carriage Bolts NB1816 with 5 16 Hex Nuts and Washers NB1862 and NB1872 3 At each end of the structure place the...

Page 33: ...bove lower skid 1 2 3 NB1622 3 8 Eye Bolt NB1863 NB1874 NB1863 NB1874 1 At each corner of the structure locate and drill a 7 16 thru hole in the corner frame centered 3 above the lower skid 2 Install...

Page 34: ...ld down tubes on the outside of the Skid Rails locate an Earth Anchor PT2200 about 3 from the skid With downward pressure screw the anchor into the soil until the eye is about 1 from the soil 2 Secure...

Reviews: