Models: PRE S 0612 H; PRE S 0715 H; PRE S 0920 H; PRE S 1125 H.
1.
Placing handle
2.
Thermostat regulator
3.
Power regulator
4.
Indicator
5.
Cord holder
6.
Towel-rack
7.
Fins
8.
Roller-leg platforms
9.
Roller-legs
IV.
Before first use
Get the radiator out of the box and place it on the foam plastic cover. Make sure whether the power cable and
the device were not damaged during the transportation.
Do not operate the radiator if there are any damages.
Attention!
The radiator should always be placed in vertical position to reduce the risk of overheating, fire or electric
shock.
V.
The installation of roller-legs
1.
The roller-legs should be installed before operating the radiator.
2.
Turn over the radiator to have access to bottom panel. Make sure that the device is on a flat surface and
there is nothing to scratch the surface of radiator.
3.
Screw out the butterfly-shape nuts from the U-shape staple. Install the U-shape staple between the fins
of radiator.
4.
Join the U-shape staple and the roller-leg platform.
5.
Screw up butterfly-shape nuts.
6.
Repeat operation 2, 3,4,5 for the second pair of roller-legs.
Figure 2
1
7
5
4
2
3
6
8
9
Summary of Contents for PRE S 0612 H
Page 1: ......
Page 3: ...II 50 120 5 2 ...
Page 5: ...2 V 1 2 3 U U 4 U 5 U 6 2 3 4 5 6 5 VI 1 6 2 6 3 4 5 6 ...
Page 16: ......