-9-
8. Attach the stabilizing rod to the anchor
bracket, using the spacer bushings,
the flat washer and nut. Torque to
52 ft. lbs. (70 Nm). Figure 13.
NOTE:
Ensure that parts are
assembled in the correct order.
9. Inspect the rear track systems and
ensure that all mounting bolts were
correctly tightened during installation.
Lower the ATV to the ground and
install the front track systems on the
ATV.
1.
Remove the flange nylon nuts from
the mounting bolts securing the rear
suspension lower arms near the front
of the differential. Figure 14.
REAR SUSPENSION STIFFENER:
Figure 14
Figure 14a
Figure 13
Flat Washer
Stabilizing Rod
Anchor
Bracket
Spacer
Bushing
Nut