101
MAINTENANCE
Track Maintenance
Track Tension
5. Check for specified slack between the wear surface of the track clip
and the plastic slider. Refer to the Track Tension Data Chart on page
100.
If the track needs adjustment:
6. Loosen the rear idler shaft bolt.
7. Loosen the locknuts.
8. Tighten or loosen the track adjusting screws to provide equal adjust-
ment on both sides of the track.
9. Repeat the measurement on the other side of the track.
TIP:
Check more frequently when the snowmobile is new.
10. Remove the weight. Start the engine and slowly rotate the track at
least five revolutions. Let the track come to a stop (do not apply
brakes).
11. Check track alignment (see page 102) and adjust as necessary.
12. Tighten the locknuts.
13. (
n
) Tighten idler shaft bolts to 35 ft. lbs. (47.5 Nm).
S
Slack Measurement
Lock Nut
Track Adjusting
Screw
Track
10 lbs. (4.54 kg)
Idler
Shaft
Bolt
16
I
(40 cm)
Summary of Contents for 600 RUSH 2011
Page 1: ...PMS 419 Snowmobile Owner s Manual for Maintenance and Safety 600 RUSH 800 RUSH...
Page 3: ...The text is printed on 100 recycled with 40 post consumer waste PCW...
Page 8: ...4...
Page 128: ...124 MAINTENANCE LOG DATE MILES KM TECHNICIAN SERVICE PERFORMED COMMENTS...
Page 129: ...125 MAINTENANCE LOG DATE MILES KM TECHNICIAN SERVICE PERFORMED COMMENTS...