FINAL DRIVE
7.13
EARLY 2004 -- FRONT
GEARCASE
REASSEMBLY/INSPECTION
1. Replace
all
O--rings,
seals,
and
worn
components.
2. Press the pinion shaft seal into the pinion cover,
until the seal is flush with the sealing surface.
3. Inspect bearings on output and pinion shafts. To
replace, press new bearing on to shaft.
NOTE:
Due to extremely close tolerances and
minimal wear, the bearings must be inspected
visually, and by feel. While rotating bearings by hand,
inspect for rough spots, discoloration, or corrosion.
The bearings should turn smoothly and quietly, with
no detectable up and down movement and minimal
movement side to side.
4. Install pinion shaft, bearing, and input cover with
new o-ring and torque bolts to 14 ft. lbs (19 Nm).
Cover Bolts Torque
14 ft. lbs. (19 Nm)
5. Install the output hub into the gearcase housing.
The output hub should spin freely.
6. Install the ring gear into the gearcase housing.
7. Slide the roll cage into the ring gear. Insert the
rollers as the roll cage is installed.
Summary of Contents for 600 Dragon SP
Page 1: ...2004 SPORTSMAN 600 700 SERVICE MANUAL PN 9918803 ...
Page 138: ...BODY STEERING SUSPENSION 5 16 NOTES ...
Page 210: ...FINAL DRIVE 7 38 NOTES ...
Page 293: ...ELECTRICAL 10 43 WIRING DIAGRAM HAND AND THUMB WARMERS WINCH HUNTER EDITION ...
Page 294: ...ELECTRICAL 10 44 NOTES ...
Page 300: ...ELECTRICAL WIRING DIAGRAM LATE 2004 SPORTSMAN 600 700 MODELS WITH FUEL GAUGE NOTES ...
Page 301: ...ELECTRICAL WIRING DIAGRAM 2004 SPORTSMAN 600 700 HUNTER EDT HAND WARM WINCH ...
Page 308: ...PN 9918803 Printed in USA ...