Technical specification and user manual PP13-170A
4/6
III. Operation and maintenance
The hurdle is ready for use immediately after delivery. The hurdle is equipped with the patent pending fully automatic
system of height adjustment, so one press of the spring-loaded button on the telescope changes simultaneously
height and counterweight position in the hurdle feet.
The height adjustment is done as follows:
a)
while holding the telescope tubes press the spring-loaded buttons simultaneously,
b)
slide the telescopes down or up to adjust the height until the buttons click.
During idle periods the hurdles must be stored in a roofed dry place. For optimal performance they should be stored
and transported on Polanik hurdle carts: HC-23 and HC-34. After every athletics season the hurdles must be cleaned
from sand (mud, dust and etc).
Even the best technical solutions cannot substitute for common sense. The usage of the product must take place
under the supervision of qualified coaches. The producer shall not be liable for any incidents caused by its misuse.
IV. Packing and transport
The hurdles are put on pallets (15 pcs on one pallet) and wrapped with foil for short distances or sent overseas in
cases.
Packing type
foiled pallet
case
contents
15 hurdles
15 hurdles
length
122
127
width
108
113
Package’s
dimensions
[cm]
height
175
187
Volume [ m
3
]
2,31
2,68
Gross weight [kg]
210
250