background image

Step F

Fix the wall channel with screw cover cup 

S1PS08

 and screw 

S1SW02

 to wall. 

Step G

Install the top and bottom roller 

S1HW02/S1HW03

 to the top and bottom holes

of the moving panel. See G.1 and G.3. Slot rollers into the top profile and then clip

in the bottom rollers as shown in G.4, G.5 and G.6.

Step H

Drill 3 equally spaced holes with 3mm drill bit through the wall profile and frame.

Fix the frame to the wall profile with screw cover cup 

S1PS08

 and screw 

S1SW03

.

Then put the screw cover cap 

S1PS07

 on.

Step I

Attach the magnetic strip 

308GB-6

 to the front of the moving panels. Adjust the

magnetic strip to ensure there is no gaps when the door is closed.

Attach the Fixed panel vertical seal 

304B-1

 to the fixed panel.

Attach the Moving panel vertical seal 

304-2

 to the end of moving panel.

Step J

Assemble the handle 

S1WH01

 onto moving panel.

Note: 

To ensure the correct rolling action and the door closes on the profile evenly,

adjust the roller by adjusting the screw clockwise or anticlockwise as shown in G.2

G.1

A

Step A

Position the wall channel with the glass panel, support

arm 

S1HW04-A 

and the wall fixing A 

S1HW04-B 

back on

the floor ensure the wall channel is plumb, and the

support arm is level. 

Step B

Mark the position of the holes in the wall. Do this by

marking the wall with a pencil through the pre-drilled

holes in the wall profile, and the position of the wall

fixing A 

S1HW04-B

. Left the wall channel and glass

panel, drill with 6mm masonry drill bit and insert wall

plug 

S1PS12

. Fix the wall channel with screw cover cup

S1PS08 and screw S1SW02 to wall. And also fix the wall

fixing A 

S1HW04-B 

to the wall.

Push the bottom seal 

H-8 

on the bottom of the glass

panel then insert the glass panel into the wall channel.

Drill 3 equally spaced holes with 3mm drill bit through

the wall profile and glass panel. Fix the glass panel to the

wall channel with screw cover cup 

S1PS08

 and screw

S1SW03

. Then put the screw cover caps 

S1SP07

 on.

Step C

Put the support arm on the top of the glass and tighten

all the grub screws as shown. 

Step A

Position the wall channel (1 x 

ALU8654

)

 ensuring the wall profile is plumb,

mark the position of the holes in the wall. Do this by marking the wall with

a pencil through the pre-drilled holes in the wall channel. Drill with 6mm

masonry drill bit and insert the wall plugs (4 x 

SBLTL001)

. Then fix the wall

channel using the screws (4 x 

SBLTL013

)

 to wall.

Step B

Drill 4 equally spaced holes with 

3mm

 drill bit through the wall profile

and upright profile. Fix them with screw cover cups (4 x 

S1PS07

) and

screws (4 x 

SBLTL003

). Then put the screw cover caps (4 x 

S1PS08

) on.

13mm

B.1

A.1

A.2

A.3

A.4

B.2

B.3

Summary of Contents for Wet Room

Page 1: ...ation No claims can be made after the products has been fitted or after fitting has commenced 4 This is a 2 person installation 5 Please note the minimum and maximum adjustment for this product are based on perfectly plumb walls EXPOLDED VIEW AND PARTS LIST 1 3 4 5 6 7 2 11 12 10 16 13 14 15 8 9 SN Code Description Qty Image SN Code Description Qty Image 1 N M Glass Panel 1 9 S1PS04 R Wall Channel...

Page 2: ...in the wall channel Drill with 6mm masonry drill bit and insert the wall plugs 4 x SBLTL001 Then fix the wall channel using the screws 4 x SBLTL013 to wall Step B Drill 4 equally spaced holes with 3mm drill bit through the wall profile and upright profile Fix them with screw cover cups 4 x S1PS07 and screws 4 x SBLTL003 Then put the screw cover caps 4 x S1PS08 on 13mm B 1 A 1 A 2 A 3 A 4 B 2 B 3 ...

Page 3: ...35 4 Remove the rail tighten the glass clamp using the screw driver Remove the wall fixing and drill with 6mm masonry drill bit and insert the wall plugs SBLTL001 Then fix the wall fixing using the screws SBLTL013 to wall Place the rail with two rail sleeves S1HW35 3 as C 5 shown adjust the rail in suitable position then tighten the grub screws using the M5 Allen Hex Key SBLTL019 C 1 C 2 C 3 C 4 C...

Page 4: ...e wall channel and the wall Wash down with clean warm water and a soft clean cloth or sponge Please do not use bleach alkaline or acid based aggressive or abrasive cleaning products 24 HRS DO NOT USE THE ENCLOSURE FOR 24 HOURS AFTER SEALING BLEACH WHITE SPIRIT D Step D PleasetheWallChannelCap S1PS04L R andUprightProfileCap S1PS05 on E ...

Page 5: ... Bifold Shower Doors Pivot Shower Doors Hinged Shower Doors Shower Screens From Top Brands Coram Shower Enclosures Mira Shower Enclosures Hydrolux Shower Enclosures Diamond Shower Enclosures With quality shower trays to match your enclosure Square Shower Trays Rectangular Shower Trays Quadrant Shower Trays Coram Shower Trays Mira Flight Shower Trays ...

Reviews: