21
9.2
SCHEME 2
Pic. 15
Scheme with heating buffer
3
,
where:1 – boiler, 2 – burner, 3 – controller, 4 – boiler temperature
sensor, 5 – fumes temperature sensor, 6 – boiler pump, 7 – heating buffer, 8 – hot water pump, 9 – hot
water silo, 10 – hot water temperature sensor, 11 – servomotor of mixing valve, 12 – room mixer
temperature sensor, 13 – mixer pump, 14 – room panel ecoSTER200 with room thermostat function, 15 –
thermostatic 3 way valve for return protection, 16 – buffer higher temperature sensor, 17 – buffer lower
temperature sensor, 18 – weather temperature sensor, 19 – additional module B.
RECOMMENDED SETTINGS:
Parameter
Setting
MENU
Preset boiler temperature
80
C
menu
boiler settings
Min. preset boiler temperature
75
C
menu
service settings
boiler settings
CH pump activating temperature
55
C
menu
service settings
CH and HUW settings
Activating operation (buffer service)
activated
menu
service settings
buffer settings
Buffer loading start temperature
50
menu
service settings
buffer settings
Buffer loading stop temperature
75
menu
service settings
buffer settings
Mixer service 1
activated CO
menu
service settings
mixer 1 settings
Max mixer preset temperaturę 1
70
menu
service settings
mixer 1 settings
Mixer heating curve 1
0.8 – 1.4
menu
mixer 1 settings
Mixer weather control 1
activated
menu
mixer 1 settings
Mixer thermostat selection 1
ecoSTER T1
menu
service settings
mixer 1 settings
3
Shown hydraulic scheme does not replace the project of central heating and serves only as a
sample!
Summary of Contents for ecoMAX850P1-R
Page 2: ......
Page 4: ......
Page 7: ...USER MANUAL OF THE CONTROLLER ecoMAX850P1 R...
Page 18: ......
Page 19: ...19 USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX850P1 R...
Page 45: ......
Page 46: ......
Page 47: ......