     1. Installation Procedure

1-9

1.2 

HCI3500 Installation, Continued

1.  Place grounding plate as shown
2.  Use screws [A] (2X) - “M6S M 4x10 washer o12,5” - to fasten 

Upstream Grounding Plate

A

Screws to use

1.2.6 

Mount Upstream Grounding Plate

6.  Place the spirit level on the infeed middle cover and on the exit middle 

cover of the HCI to check that the machine is leveled.

7.  Place one foot under the left screw [E] (behind the door).

E

F

8.  Place the other foot under the right screw [F] (behind the lower tray).
9.  Adjust the screws height until they touch the feet.
10. Return  the spanner to the original location in the machine.

1.2.5 

Adjust Machine Height (Continued)

Summary of Contents for HCI3500

Page 1: ...x17162C 07 June 2018 HCI3500 Installation Instruction...

Page 2: ...2 4 Disconnect Power Install Termination Plugs and Cable Protection 1 7 1 2 5 Adjust Machine Height 1 8 1 2 6 Mount Upstream Grounding Plate 1 9 1 2 7 Mount Downstream Grounding Plate 1 10 1 2 8 Dock...

Page 3: ...chine and easily accessible Make sure the plug is firmly inserted in the outlet 2 Avoid multi wiring 3 Be sure to ground the machine 4 Never place anything on the power cord Universal Power Supply 100...

Page 4: ...C13 4 5m Accessories box 7 1 Termination Plug Female Accessories box 8 1 Termination Plug Male Accessories box 9 1 Spanner 24mm Front of the machine 10 1 USB to STM32F Dongle Rear of the machine 11 1...

Page 5: ...1 Cable Protection Accessories box 21 4 Paper Support Accessories box 22 1 Decurler Paper Guide Accessories box 23 2 Foot Accessories box 24 4 Screw M6SF T20 M4x10 Accessories box 25 2 Screw M6SF TT M...

Page 6: ...se screws A 2X M6S M 3x5 to fasten Upstream Sheet Guides 3 If the HCI is being installed to a Buffer unit follow steps number 4 and 5 as well otherwise skip to 1 2 3 4 If the HCI is being installed to...

Page 7: ...e does not have a decurler installed follow steps 1 to 5 instead 6 Place Decurler Paper Guide as shown 7 Use screws A 2X M6S M 3x5 to fasten Decurler Paper Guide 1 2 2 Mount Upstream Sheet Guides or D...

Page 8: ...ermination plugs as shown 3 Install Cable Protection A 4 Fasten screws M6SF TT M5x10 B 2X Male Plug Female Plug B A Screws to use 1 2 4 Disconnect Power Install Termination Plugs and Cable Protection...

Page 9: ...all four corners of the machine NOTE the distance D might be different depending on system con figuration e g whether the upstream device has a decurler or not and on floor characteristics 5 Place a s...

Page 10: ...am Grounding Plate 6 Place the spirit level on the infeed middle cover and on the exit middle cover of the HCI to check that the machine is leveled 7 Place one foot under the left screw E behind the d...

Page 11: ...mechanism B 4 Align the docking mechanisms on the Upstream Device and the HCI3500 5 Push the machines together 6 Push the locking mechanism back in 7 Re install locking screw A B 1 2 8 Dock to Upstrea...

Page 12: ...ector A to the printer 2 Connect the downstream device connector B to the HCI3500 1 2 11 Connect Electrical Connectors A B 1 2 10 Dock Downstream Device 1 2 9 Install Paper Supports 1 Open up upper tr...

Page 13: ...lifting the cover up and then out using the handles B 3 Turn off Service Power Switch C 4 Replace Rear Cover 5 Retry Section 1 2 12 Steps 3 through 6 1 2 HCI3500 Installation Continued C B A 1 2 13 Tu...

Page 14: ...stem service manual 6 If a new software is installed recalibrate the DSD sensors according to the procedure described in the System Operator Manual 7 Turn off the main power switch 1 Turn on the upstr...

Page 15: ......

Page 16: ......

Reviews: