background image

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

ZIG ZAG STEEL NET WALL

Rev B

8/13/2010

1968

Page 3 of 3

R5 Parts List

Specifications

ZIG ZAG STEEL NET WALL:
Shall be fabricated from 2.375" O.D. 11 gauge
steel outer frame welded to 1.315" O.D. 11 gauge 
steel rungs. 1/4" steel clevises will be welded to 
frame. Zig Zag Steel Net Wall will have a multi-stage 
baked-on powder coat finish.

MOUNTING BLOCKS:
Shall be two-part and precision die-cast from a high 
strength aluminum alloy. The Mounting Blocks have 
a multi-stage baked-on powder coat finish. 

HARDWARE:
Shall be stainless steel, zinc/nickel plated or 
galvanized as required to resist rust and corrosion.

R3.5 Parts List

Part #

DESCRIPTION

QTY.

FS-1968-R5

Zig Zag Steel Net Wall 90 R5

1

GF-7006-B

Mounting Block R5 Bottom

2

GF-7006-T

Mounting Block R5 Top

2

9143112-TR

Bolt Shoulder 3/8" x 2-1/2" BH

2

9281062-5-TR

Screw Soc HD CS 1/4" x 1-3/8" TR

2

9345002

Washer Flat SAE 1/2"

4

9443092-TR

Nut Barrel 3/8" x 2" BH

2

Part #

DESCRIPTION

QTY.

FS-1968-R35

Zig Zag Steel Net Wall 84 R3.5

1

GG-8110

Mounting Block 4 Top R3.5

2

GG-8111

Mounting Block 4 Bottom R3.5

2

9143112-TR

Bolt Shoulder 3/8" x 2-1/2" BH

2

9281062-5-TR

Screw Soc HD CS 1/4" x 1-3/8" TR

2

9345002

Washer Flat SAE 1/2"

4

9443092-TR

Nut Barrel 3/8" x 2" BH

2

Step 3

 
Insert legs into footing holes and attach Zig Zag 
Steel Net Wall to collars as shown in Figure 1.1. 
(See Note A) 

Figure 1.1

Step 4

 
Fully tighten all fasteners according to the 
"TIGHTENING TORQUE FOR HARDWARE" section 
of the Installation Manual.

Step 5

 
Plumb and level entire component. Pour concrete into 
footing hole. Allow at least 72 hours to cure before 
using this equipment.  (See Note B)

Step 6

 
Place appropriate compliant protective surfacing under 
and around Zig Zag Steel Net Wall. (See Note D)

Periodically tighten all screws, bolts and nuts. A 
periodic inspection of all parts is necessary. If a part 
is broken or worn, replace immediately. For general 
maintenance please refer to our Playground 
Maintenance Manual.

Maintenance

BLOCK 

BOTTOM

Shoulder Bolt

3/8" x 2-1/2" 

Washer

1/2" SAE 

Washer

1/2" SAE 

Barrel Nut

3/8" x 2" 

WALL

STEEL NET 

BLOCK TOP

MOUNTING 

ZIG ZAG 

MOUNTING 

1/4" x 1-3/8" TR 
Socket Head Screw

Reviews: