For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
TRI-PAD TRAVERSE RV
INSTALLATION INSTRUCTIONS
Rev C
3/30/2013
RV-1419
Page 2 of 5
Footing Detail
Step 1
Refer to Footing Layout and mark footing hole locations.
Dig (3) Ø 12" footing holes. Refer to Footing Detail for
depth and details.
IMPORTANT: For areas with soft soil conditions,
larger footings may be required.
* Footing depth must be adjusted to
compensate for the depth/thickness
requirements of selected safety
surfacing. See Section 06.1 of the
Installation Manual.
** Height shown from finished grade
to mounting hole.
Top View - Footing Layout
Optional Filter Fabric over
Pea Gravel (for drainage)
Concrete Footing
Blocking, see
Installers Manual
2b Stone, drain rock
Undisturbed Soil
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note C)
(Top of Soil)
(Finish Grade)
27"
*
686mm
18"
457mm
12"
305mm
82
1
2
"
**
2096mm
23"
584mm
25"
635mm
25"
635mm
Elevation View
4"
Maximum
102mm