background image

www.playcraftsystems.com

For Customer Service Call

800.333.8519 (U.S.A.) or 541.955.9199 (International)

TRANSITION WALL

INSTALLATION INSTRUCTIONS

Rev J

8/19/2020

1310

Page 3 of 3

TRANSITION WALL:

Shall be fabricated from 1.315" O.D. 12 guage steel 

tubing, welded 1.029" O.D. 14 guage vertical rails 

and handles and 1/2" thick steel tabs and will have 

a multi-stage baked on powder coat finish.

SOCKET CLAMPS:

Shall be two-part and precision die-cast from a high 

strength aluminum alloy and will have a multi-stage 

baked on powder coat finish.

HARDWARE:

Shall be stainless steel, zinc/nickel plated or 

galvanized as required to resist rust and corrosion.

R5 TRANSITION WALL

Part #

DESCRIPTION

QTY.

Varies

Transition Wall R5

1

HS-1001-R5

Socket Clamp Set R5

2

9103062-TR

Bolt Button Head 3/8" x 1-1/4"

2

9333002

Washer Flat 3/8" x 1" O.D. x .100" thick

4

9413002

Nut Lock 3/8"

2

R3.5 TRANSITION WALL

Part #

DESCRIPTION

QTY.

Varies

Transition Wall R3.5

1

HS-1001-R35

Socket Clamp Set R3.5

2

9103062-TR

Bolt Button Head 3/8" x 1-1/4"

2

9333002

Washer Flat 3/8" x 1" O.D. x .100" thick

4

9413002

Nut Lock 3/8"

2

Parts List

Specifications

Periodically tighten all screws, bolts and nuts. A 

periodic inspection of all parts is necessary. If a part 

is broken or worn, replace immediately. For general 

maintenance please refer to our Playground 

Maintenance Manual.

Maintenance

Reviews: