Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
REVOLUTION POST TOP CAP
INSTALLATION INSTRUCTIONS
Rev A
4/1/2011
RV-21000
Page 2 of 2
Periodically tighten all screws, bolts and nuts. A
periodic inspection of all parts is necessary. If a part
is broken or worn, replace immediately. For general
maintenance please refer to our Playground
Maintenance Manual.
Maintenance
Parts List
Specifications
Step 1
Rotate Post Top Cap to desired facing and secure
as shown in Figure 2.
NOTE: Refer to Playground Equipment Manual for
suggested Post Top Cap facing.
REVOLUTION POST TOP CAP:
Shall be precision die-cast from a high-strength
aluminum alloy. The Revolution Post Top Cap shall
have a multi-stage baked-on powder coat finish.
HARDWARE:
Shall be stainless steel, zinc/nickel plated or
galvanized as required to resist rust and corrosion.
Part #
DESCRIPTION
QTY
GH-0002
Revolution Post Top Cap
1
9271062-TR
Screw Tek 1/4" x 1-1/4" BH TR
3
FIGURE 2
1/4"x 1-1/4" BH TR
Tek Screw
TOP CAP