background image

Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com

For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)

REVOLUTION POST TOP CAP

INSTALLATION INSTRUCTIONS

Rev A

4/1/2011

RV-21000

Page 2 of 2

Periodically tighten all screws, bolts and nuts. A 
periodic inspection of all parts is necessary. If a part 
is broken or worn, replace immediately. For general 
maintenance please refer to our Playground 
Maintenance Manual.

Maintenance

Parts List

Specifications

Step 1

 

Rotate Post Top Cap to desired facing and secure 
as shown in Figure 2.

NOTE: Refer to Playground Equipment Manual for 
suggested Post Top Cap facing.

REVOLUTION POST TOP CAP:
Shall be precision die-cast from a high-strength
aluminum alloy. The Revolution Post Top Cap shall 
have a multi-stage baked-on powder coat finish.

HARDWARE:
Shall be stainless steel, zinc/nickel plated or 
galvanized as required to resist rust and corrosion.

Part #

DESCRIPTION

QTY

GH-0002

Revolution Post Top Cap

1

9271062-TR

Screw Tek 1/4" x 1-1/4" BH TR

3

FIGURE 2

1/4"x 1-1/4" BH TR 

Tek Screw

TOP CAP

Reviews: