background image

assistance.

1) 

Your table is designed for use indoors in a climate controled environment only.  

 

Damage can occur if the table is exposed to water, dampness, high humidity,

 

freezing temperatures, etc.

2)       Professional assembly is strongly recommended. This assembly manual is intended to 

           guide an experienced slate pool table installer with the assembly process of this 

           for which the process is the same regardless of the cabinet type.

2) 

The pool table cabinet and slate are extremely heavy. Two or more people are 

 

required for assembly. 

 

or serious injury.

5) 

Only use the table for its intended purpose.

6) 

Damaged or worn parts may be dangerous for users and the integrity of the table. 

 

will void the warranty.

8) 

Check all screws, bolts, etc. on a regular basis to ensure that they are in good working 

 

as required with owning a slate pool table

Bull Run

altering

Summary of Contents for FairField Bull Run

Page 1: ...Bull Run ASSEMBLY INSTRUCTIONS ...

Page 2: ...ler with the assembly process of this for which the process is the same regardless of the cabinet type 2 The pool table cabinet and slate are extremely heavy Two or more people are required for assembly or serious injury 5 Only use the table for its intended purpose 6 Damaged or worn parts may be dangerous for users and the integrity of the table will void the warranty 8 Check all screws bolts etc...

Page 3: ...Y POSITION GRADE A BEAM H7 SIDE SLATE1 805 1295 40 1 ASSEMBLY POSITION TOP RAIL H8 MIDDLE SLATE 805 1295 40 1 PCS ASSEMBLY POSITION TOP RAIL H9 SIDE SLATE 2 805 1295 40 1 ASSEMBLY POSITION TOP RAIL H10 CLOTH 1 ASSEMBLY POSITION TOP RAIL H11 1 4 TOP RAIL 1083 164 43 2 PCS ASSEMBLY POSITION TOP RAIL H12 2 5 TOP RAIL 1111 164 43 2 PCS ASSEMBLY POSITION TOP RAIL H13 3 6 TOP RAIL 1101 164 43 2 PCS ASSE...

Page 4: ...SS BEAM ASSEMBLY POSITION D FLAT WASHER M12 30 2 4 PCS USED TO FIX THE CROSS BEAM ASSEMBLY POSITION E ACRON NUT M12 4 PCS USED TO FIX THE CROSS BEAM ASSEMBLY POSITION F HEXAGON BOLT 4 2 60 8 PCS USED TO FIX THE MIDDLE BEAM ASSEMBLY POSITION G HEXAGON BOLT ø10 70 10 PCS FOR CROSS BEAM AND TABLE LEG ASSEMBLY POSITION H ADJUSTABLE SCREW ø10 100 12 PCS I ø10 50 4 PCS USED TO ADJUST AND LEVEL THE SLATE...

Page 5: ...BLY POSITION O HEXAGON BOLT ø8 80 28 PCS 8PCS FOR TOP RAIL AND CORNER 8PCS FOR APRONS AND 12PCS FOR APRONS AND TOP RAIL ASSEMBLY POSITION P HEXAGON BOLT ø8 35 12 PCS USED TO FIX THE TOP RAILS AND SLATE ASSEMBLY POSITION Q HEXAGON BOLT ø10 60 18 PCS USED TO FIX THE TOP RAILS AND SLATE ASSEMBLY POSITION R DOME WASHER M10 30 5 18 PCS USED TO FIX THE TOP RAILS AND SLATE S SIDE POCKET 4 PCS ASSEMBLY PO...

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ...Customer Service Global Merchants Inc 12 Lunar Drive Woodbridge CT 06525 ...

Reviews: